BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 22, 2025 at 7:00 PM

Updated December 23, 2025

Site work and renovation of a bridge / tunnel in Walnut Grove, California. Conceptual plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.

The selected consultant (herein referred to as "Consultant") will be responsible for the following: Consultant shall perform professional and technical engineering services for the design of the proposed project and provide construction assistance as required. Consultant shall prepare reports, plans, specifications, and estimates (PS&E) to the current County Standards and in accordance with other applicable requirements and industry standards. A generalized scope of services is listed below. Phase I - Preliminary Engineering The major tasks to be included in this phase are as follows: A. Project Management B. Improvement Design C. Coordination with Permitting Agencies A. PROJECT MANAGEMENT Consultant shall perform project management and administration tasks required to provide supervision of the work and coordination with the County. Project Management shall apply to all phases of work and shall continue to completion of the project design. Tasks will include the following: i. Consultant shall attend a project kick-off meeting with the County to review the scope of work, the initial tasks to be performed, the project schedule, the critical task items, and areas of concern, and to participate in a general exchange of views and ideas regarding the execution of the project. ii. Consultant shall prepare, update, and submit a project schedule to the County on a monthly basis. The schedule shall show each work activity, when that activity will begin, and how long it will continue, and identify the critical tasks. The schedule shall clearly differentiate between those functions carried out by Consultant, the County, and other involved parties. iii. Consultant shall prepare and submit requests for changes in scope, release of contingency, or amendments to contracts when appropriate. iv. Consultant shall establish a quality control plan and perform internal quality control reviews at critical stages of the project. v. Consultant shall administer and supervise the work of all subconsultants contracted for the project work. B. PRELIMINARY DESIGN Consultant will be responsible for the following tasks: i. General Plan Sheets Prepare and submit a General Plan sheet for the bridge maintenance. This submittal will be considered 30% design. County will have an opportunity to review a draft version prior to finalization. Five (5) copies of the final General Plan sheet shall be submitted to the County. ii. Engineer's Estimate Prepare and submit a preliminary construction cost estimate for the bridge repairs C. COORDINATION WITH PERMITTING AGENCIES County will take the lead in coordination with permitting agencies. Consultant may be asked to provide supporting information regarding proposed improvements as well as construction methods and staging for use in development of the environmental document. County will provide all environmental documents necessary to satisfy CEQA and NEPA requirements. Questions concerning this RFP should be submitted in OpenGov Procurement Question Submission Deadline:November 28, 2025, 4:00pm Question Response Deadline:December 5, 2025, 5:00pm

Conceptual

Bridges / Tunnels

$450,000.00

Public - County

Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
415
Active Projects
178
Bidding Soon
2,152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2026

Project location map

Multiple Locations, Walnut Grove, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.