BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work and new construction of an office development in Richmond, Virginia. Completed plans call civil work for an office development.

Install a new, fully functional, variable refrigerant flow system units in order to control climate in various areas of the sleeping quarters of the Fire Station. The completion date shall be no later than 90 days after notice to proceed. PECIFIC REQUIREMENTS The contractor shall: o Remove the two current heat pump systems outside of building 201, the Fire Station. o Remove a total of 13 mini split head units, including their corresponding wall mounted thermostat o Remove the two current refrigerant manifolds located in the ceiling of the living quarters of the building where the work is being performed o Install a new 15-ton variable refrigerant flow, three pipe, system to manufacture specification in the area where the previous heat pump systems were located. o Install a new refrigerant manifold (branch circuit controller) in place of the two manifolds that were previously removed o Install a total of 13, 1-ton mini split heads, one per living quarter in addition to their corresponding wall mounted thermostat. o Must be a three-wire wall mounted thermostat in order to have simultaneous heating and cooling capabilities. o Charge the system with the appropriate amount of refrigerant recommended by the manufacturer in order to operate at its maximum efficiency. o Provide commissioning and startups IAW with this SOW. o Secure their work area at the end of each day to ensure the safety of the occupants while the contractors and subcontractors are off the premises o This shall include, but is not limited to: performing basic cleanliness procedures such as sweeping and disposing of waste, securing tools and materials, posting cautionary signage if necessary, etc. o Provide their own lavatory throughout the duration of the Period of Performance CONTRACTOR QUALIFICATIONS The Contractor shall be normally engaged in HVAC, as their primary line of business and shall have at least 5 years of documented experience working on Air Conditioning systems.

Post-Bid

Office

$10,000,000.00

Public - Federal

New Construction, Site Work

3

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
94
Bidding Soon
1,591
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2025

January 9, 2026

Project location map

To Be Determined, Richmond, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.