BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

Site work for a water / sewer project in West Sacramento, California. Working plans call for site work for a water / sewer project.

**As of January 14, 2026, no bids received. No definite date for the rebid.** The City of West Sacramento is accepting sealed responses for Actiflo ATS Breaker and Controller Replacement and 12KV Breaker Replacement & Testing. The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached in the reference documents. The scope includes the replacement of the Actiflo ATS breaker and controller as well as the replacement and testing of a 12KV breaker. Instructions to bidders are found in the referenced attachments and provide specific guidance on bid preparation and submission. Question Deadline 12/05/2025 at 5:00 PM PT A Proposer may submit Questions related to this RFP to the City through the Citys e-Procurement Portal 12KV Breaker Replacement & Testing City will be providing new vacuum circuit breaker - Toshiba HVK 1500V / 1200 Amp Contractor is responsible for any miscellaneous materials to complete the job City will coordinate with contractor and PG&E for power shutdown Removal of old vacuum breaker (IEM VK-10M 25) Insall new vacuum breaker (Toshiba HVK 1500V / 1200 Amp) City will retain the old breaker (IEM VK-10M 25) Adjust trip settings based on recent arc flash coordination study recommendations Perform primary injection testing on new breaker Re-energize and test as required "Actiflo" Automatic Transfer switch Controller and Breaker Replacement City will be providing new ATS controller Eaton ATC-900 with upgrade kit City will be providing new Power monitor (Model Number) City will be providing new 3 phase 2500amp breaker (Eaton SPB-100M) Contractor is responsible for any miscellaneous materials to complete the job Remove old Automatic Transfer Switch controller (Eaton ATC-600) Install new upgraded Automatic Transfer switch controller (Eaton ATC-900 with upgrade kit) Remove and install new power monitor (Model Number) Remove old 3 phase 2500amp breaker (Eaton SPB-100M) Install new 3 phase 2500amp breaker (Eaton SPB-100M) Program and adjust trip settings based on recent arc flash coordination study recommendations Perform testing as required

Final Planning

Water / Sewer

$30,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
457
Active Projects
216
Bidding Soon
2,546
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2025

July 14, 2026

Project location map

400 N Harbor Blvd, West Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.