Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 24, 2026 at 8:00 PM
Updated March 25, 2026
Demolition, site work and paving for a bridge / tunnel in Burlington, Ontario. Design plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Replacement of a pedestrian bridge at Ireland Park; rehabilitation of pedestrian bridges at the following locations: Centennial Recreation Trail; City View Park; Crosstown Trail; Duncaster Park; Pineland Park; Sharpe Rd/Ferguson Dr; Sherwood Forest Park; Cavendish Park; Dundas St/Appleby Line; Emerald Crescent; Optimist Park; and Taywood Park. TIMELINE: Request for Proposal for consultants for design has been awarded. Project is in preliminary design. Tender and construction timelines may be confirmed fall 2026.
Design
Bridges / Tunnels
$1,800,000.00
Public - City
Demolition, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 5, 2026
Multiple Locations, Burlington, ON
Related To This Project
Burlington, ON
Bid Date: Nov 25 2025
Burlington, ON
Bid Date: Nov 27 2025
Burlington, ON
Bid Date: Jan 07 2026
Burlington, ON
Bid Date: Jun 27 2019
Burlington, ON
Bid Date: Jan 26 2026
Burlington, ON
Bid Date: Dec 18 2025
Burlington, ON
--
Burlington, ON
--
Burlington, ON
--
Burlington, ON
Bid Date: Dec 09 2025
Burlington, ON
--
Burlington, ON
Bid Date: Dec 03 2025
Burlington, ON
Bid Date: Nov 07 2025
Burlington, ON
--
Burlington, ON
Bid Date: Nov 14 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
