Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 23, 2025 at 7:00 PM
Updated December 24, 2025
Renovation of a medical facility in Salinas, California. Completed plans call for the renovation of a medical facility.
As of December 23, 2025, this project has been awarded. It will commence in April of 2026 and conclude in May of 2026. Original solicitation below for reference: General Description. Salinas Valley Health (SVH) is pursuing the replacement of the existing chiller and cooling tower in the Downing Resource Center (DRC) located at 450 East Romie Lane in Salinas, CA. The chiller and cooling tower are located in the DRC basement mechanical room, with sidewall louvers bringing in air and discharging air from the tower. Due to the aging of existing equipment which provides comfort-cooling to the DRC, the project scope requires the removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing Siemens Building Management System (BMS). A refrigerant leak detection system shall be design-build by the Contractor. All electrical work shall be contracted directly by SVH. Questions. All requests for interpretation of the drawings and specifications or other questions regarding this project during the bidding process shall be submitted to SVH in writing by email. No telephone questions will be accepted. All written requests for interpretation (RFIs) or correction of the Contract Documents must be received by 5:00 p.m. on November 21st. Send all pre-bid questions and requests for interpretation to SVH via email at: bjesse@bogardconstruction.com. Labor & Material Payment and Performance Bonds. The successful bidder will be required to furnish a labor & material payment bond and performance bond equal to one hundred percent (100%) of the Contract Price. Each bond must meet the statutory requirements for a public construction project as set forth in California Civil Code Section 3248. The bonds shall be secured through a surety company approved by SVH and paid for by the Prime Contractor. Bid Acceptance/Rejection. SVH reserves the right to reject any or all bids and to waive any informalities in the bidding, or in any bid received
Award
Medical
$838,258.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2025
April 6, 2026
450 E Romie Ln, Salinas, CA
Related To This Project
Salinas, CA
Bid Date: Dec 18 2025
Salinas, CA
Bid Date: Jan 27 2026
Salinas, CA
Bid Date: Feb 13 2026
Salinas, CA
Bid Date: Feb 26 2026
Salinas, CA
Bid Date: Mar 13 2026
Salinas, CA
Bid Date: Feb 27 2026
Salinas, CA
Bid Date: Oct 30 2025
Salinas, CA
Bid Date: Oct 01 2025
Salinas, CA
Bid Date: Oct 10 2025
Salinas, CA
--
Salinas, CA
Bid Date: Oct 14 2025
Salinas, CA
Bid Date: Jan 26 2026
Salinas, CA
Bid Date: Sep 15 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
