Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 5, 2025 at 7:00 PM
Updated December 6, 2025
Site work for a playground / park / athletic field in Belton, Missouri. Completed plans call for site work for a playground / park / athletic field.
Wallace Park Playground . Requests for information related to this RFP should be directed to: Kevin Feeback Belton Parks and Rec Assistant Director Telephone: 816-642-6510 E-Mail: kfeeback@beltonparks.org The City of Belton hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry or national origin in consideration for an award. Federal Land and Water Conservation Funds are being used in this project, and all relevant federal, state, and local requirements apply. Question Deadline 12/01/2025 All questions regarding the bidding of this project must be submitted to Kevin Feeback Parks and Rec Assistant Director, City of Belton, by phone at (816) 348- 7400 or by email at brianw@beltonparks.org. All questions must be received (3) days prior to the bid opening. ocation: Wallace Park Project Completion: Spring 2026 1. Project Overview The City of Belton Parks and Recreation Department is seeking proposals from qualified playground design and installation firms for the design, supply, and installation of an allinclusive commercial grade playground located at Wallace Park. The project will include two separate play structures: one designed for children ages 2-5 years and one for children ages 5- 12 years, incorporating inclusive design principles to ensure accessibility and play opportunities for children of all abilities. Along with other stand-alone equipment and amenities. 2. General Requirements The selected contractor shall provide all labor, materials, equipment, and incidentals necessary to complete the project as described. The project will be delivered as a turnkey installation, ready for public use upon completion. All work shall comply with applicable ASTM, CPSC, and ADA standards for playground safety and accessibility, as well as all local codes and permitting requirements. Design Elements o Two distinct ADAAG-compliant playground structures: o Structure 1 (Ages 2-5): Designed for early childhood development with lower deck heights, slide, sensory-rich play panels, and transfer points for accessibility. o Structure 2 (Ages 5-12): Designed for older children with ramp accessibility, higher climbing features, slides, net climbers, and interactive play zones. o Ground-level sensory panels and activity components o Use of existing site elevations to integrate a hillside slide feature along with hillside climbing features. Stand Alone Equipment o 2 Bay single post configuration w/tot arm o 2 Spinners (one large-over 10' diameter, one small) o Rope climber o Surface mount musical instruments o Preferred material: Durable metal construction with high-quality powder coating and UV-18 or better plastics Site Work and Installation The contractor will be responsible for: o Site grading as required to prepare for equipment installation and drainage improvements o Installation of an appropriate drainage system to support poured-in-place surfacing o Installation of concrete curbing, 5' sidewalk around entire playground parameter, sidewalk connections, and any related site infrastructure necessary for ADA compliance o Installation of poured-in-place rubber surfacing across all play zones o Coordination with Park staff to maintain alignment with existing site elevations and design intent Additional Amenities Proposals shall include the following site amenities integrated into the playground design: o At least three shade structures over seating areas o Benches for caregivers and visitors o One ADA drinking fountain with bottle filler and doggie bowl Deliverables The selected contractor shall provide: o Conceptual design drawings, color renderings, and layout for review and approval o Detailed cost breakdowns for all equipment and installation components o Construction schedule and project milestones o Warranty information for all playground equipment must be nonprorated o Warranty information for all surfacing materials o Contractor will be responsible for 3rd party testing of surfacing material
Post-Bid
Playgrounds / Parks / Athletic Fields
$400,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2025
January 5, 2026
16400 N Mullen Rd, Belton, MO
Related To This Project
Belton, MO
Bid Date: Dec 19 2025
Belton, MO
Bid Date: Dec 05 2025
Belton, MO
Bid Date: Dec 03 2025
Belton, MO
Bid Date: Dec 18 2025
Belton, MO
Bid Date: Dec 03 2025
Belton, MO
Bid Date: Nov 13 2025
Belton, MO
Bid Date: Oct 16 2025
Belton, MO
Bid Date: Oct 14 2025
Belton, MO
Bid Date: Oct 28 2025
Belton, MO
Bid Date: Mar 09 2021
Belton, MO
Bid Date: Oct 09 2025
Belton, MO
Bid Date: Sep 26 2025
Belton, MO
Bid Date: Jan 16 2026
Belton, MO
Bid Date: Aug 29 2025
Belton, MO
Bid Date: Aug 22 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
