Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 18, 2025 at 7:00 PM
Updated November 19, 2025
New construction of an educational facility in Tiptonville, Tennessee. Design plans call for the construction of a 6,000-square-foot, one-story above grade educational facility.
As of November 18, 2025, the architect has been selected, and the project is currently in the design phase. Construction is expected to begin in March or April 2026 and is projected to take approximately six months. Location - Bill Lewis Baseball Complex A detailed scope of work has not been determined.
Design
Educational
$1,000,000.00
Public - State/Provincial
New Construction
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
800 Vaughn Dr, Tiptonville, TN
Related To This Project
Tiptonville, TN
Bid Date: Feb 18 2026
Tiptonville, TN
Bid Date: Feb 13 2026
Tiptonville, TN
Bid Date: Apr 02 2026
Tiptonville, TN
Bid Date: Nov 14 2025
Tiptonville, TN
Bid Date: Nov 07 2025
Tiptonville, TN
Bid Date: May 08 2019
Tiptonville, TN
Bid Date: Nov 07 2025
Tiptonville, TN
Bid Date: Aug 11 2025
Tiptonville, TN
Bid Date: Jul 29 2025
Tiptonville, TN
Bid Date: Feb 18 2026
Tiptonville, TN
Bid Date: May 01 2025
Tiptonville, TN
Bid Date: Oct 21 2020
Tiptonville, TN
Bid Date: Feb 07 2025
Tiptonville, TN
--
Tiptonville, TN
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
