BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2025 at 7:00 PM

Updated December 9, 2025

Renovation of an educational facility in Old Tappan, New Jersey. Completed plans call for the renovation of a educational facility.

DASNY will not be responsible for receipt of bids which do not comply with these instructions. All individuals who plan to attend pre-bid meetings or bid openings in person will be required to present government-issued picture identification to building security officials and obtain a visitors pass prior to attending the bid opening. Individuals and entities submitting bids in person or by private delivery services should allow sufficient time for processing through building security to assure that bids are received prior to the deadline for submitting bids. MBE (0%), WBE (0%) Question Deadline 12/26/2025 Prospective bidders shall examine the Contract Documents carefully and, before bidding, shall make a written request to the Owner and Design Professional, for an interpretation or correction of any ambiguity, inconsistency, or error therein which should be discovered by a reasonably prudent bidder. Every request for such interpretation must be received at least ten (10) days prior to the date fixed for the opening of the bid. Prospective bidders shall examine the Contract Documents carefully and, before bidding, shall make a written request to the Owner and Design Professional, for an interpretation or correction of any ambiguity, inconsistency, or error therein which should be discovered by a reasonably prudent bidder. Every request for such interpretation must be received at least ten (10) days prior to the date fixed for the opening of the bid. Question Deadline 12/26/2025 GENERAL REQUIREMENTS OF CONTRACTS A. Extent of Contract: Requirements indicated on drawings and in specification sections determine which Contract includes a specific element of the Work of the Contract. 1. The work described in this section for each contract shall be complete systems and assemblies, including products, components, accessories, and installation required by the respective contract documents. 2. Blocking, backing panels, sleeves, and metal fabrication supports for the work of each contract shall be the work of such Contract. 3. Equipment pads for the work of each contract shall be the work of such contract. 4. Roof-mounted equipment curbs for the work of each contract shall be the work of the construction contract. 5. Painting for the work of each contract shall be the work of such contract. 6. Cutting and Patching: Each contract shall perform its own cutting and patching. 7. Firestopping for the work of each contract shall be provided by such contract. B. Redundant with Section 13200Substitutions: Each contractor's project manager shall cooperate with all other contractor's project managers involved to coordinate approved substitutions with remainder of the work of the Project. C. Temporary Facilities and Controls: In addition to specific responsibilities for temporary facilities and controls indicated in this Section and in Section 015000 - Temporary Facilities and Controls, Contractor is responsible for the following:Installation, operation, maintenance, and removal of each temporary facility necessary for its own normal construction activity, and costs and use charges associated with each facility, except as otherwise provided for in this Section 011200. 2. Plug-in electric power cords and extension cords, supplementary plug-in task lighting, and special lighting necessary exclusively for its own activities. 3. Its own storage and fabrication sheds. 4. Temporary enclosures for its own construction activities. 5. Staging and scaffolding for its own construction activities. 6. General hoisting facilities for its own construction activities. 7. Waste disposal facilities, including collection and legal disposal of its own hazardous, dangerous, unsanitary, or other harmful waste materials. 8. Progress cleaning of work areas affected by its operations on a daily basis. 9. Secure lockup of its own tools, materials, and equipment. 10. Construction aids and miscellaneous services and facilities necessary exclusively for its own construction activities.HVAC WORK A. Work in the HVAC Work includes, but is not limited to, the following: 1. HVAC systems and equipment. 2. HVAC instrumentation and controls. 3. HVAC testing, adjusting, and balancing. 4. Building automation system.

Sub-Bidding

Educational

$600,000.00

Public - State/Provincial

Renovation

38

28

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
911
Active Projects
329
Bidding Soon
7,421
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

February 6, 2026

Project location map

140 Orangeburgh Rd, Old Tappan, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.