Published January 19, 2026 at 7:00 PM

Updated January 20, 2026

Site work for a water / sewer project in Fair Oaks Ranch, Texas. Completed plans call for site work for a water / sewer project.

As of January 19, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. The City is seeking a contractor for expansion of the existing wastewater treatment plant (WWTP) and effluent conveyance system upgrades. The current effluent pump station does not have the capacity to pump all the way from the WWTP to the discharge point at the golf course ponds. The City must utilize a secondary pumping station (i.e. irrigation pump station) on the WWTP which has limited storage capacity, challenging the City's ability to move treated effluent out of the plant. In addition, the influent (bottom of the hill) lift station also requires various improvements. The scope of work consists of the following: o Installation of upgrades to one existing pump station, including, but not limited to: modifications to the wet well, pumps, piping, valves, electrical and controls, SCADA, and miscellaneous appurtenances. o Installation of upgrades to one existing sanitary sewer lift station, including, but not limited to: modifications to the wet well, pumps, piping, valves, electrical and controls, and miscellaneous appurtenances. o Installation of approximately 10,400 linear feet of 12-inch PVC effluent water main and abandon in place existing 6-inch and 8-inch pipe to Blackjack 1 effluent storage pond. o Installation of an odor control system and rehabilitation of miscellaneous appurtenances at the headworks. (BID ADDITIVE ALTERNATIVE 1). o Installation of approximately 60 linear feet of 12-inch PVC sewer main replacement with manhole installation. (BID ADDITIVE ALTERNATIVE 2). Question Deadline 12/08/2025 at 5:00 PM CT The project timeline is 365 calendar days from issuance of a Notice to Proceed to final completion. Submission of Questions Any questions should be submitted in writing to: Clayton Hoelscher, Procurement Manager City of Fair Oaks Ranch choelscher@fairoaksranchtx.org The City reserves the right to withdraw the RFP at any point. At any time prior to the specified solicitation due time and date, a firm may withdraw their proposal by submitting a written request stating the reason for withdrawal.

Bid Results

Water / Sewer

$5,816,968.00

Public - City

Site Work

83

19

24

7

Subscribe For Documents

115 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
128
Bidding Soon
2,903
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

February 16, 2026

Project location map

To be determined, Fair Oaks Ranch, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.