BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work and new construction of an educational facility in Lexington, Kentucky. Completed plans call for the construction of a 87,352-square-foot, four-story above grade educational facility.

This is the second phase of a two-phase project. Phase 1, already under construction, includes earthwork, storm drainage, erosion control, new site utilities, demolition of existing site utilities, general requirements and LEED requirements for early work, concrete foundations, slab-on-grade, and structural steel framing. The Phase 2 Work consists of, but is not limited to, the following: Construction of a new four-story, 87,352 gross square foot facility on the Bluegrass Community and Technical College Newtown Campus in Lexington, Kentucky. Primary building systems consist of: brick veneer over cold-formed metal stud exterior walls for Levels 01-03; formed metal panel over cold-formed metal stud exterior walls at Level 04; a two-ply SBS modified bitumen roof system; geothermal water-source heat pumps with a dedicated outdoor air unit (DOAS) located within the building. Vertical circulation includes three egress stairwells and two machine room-less traction elevators providing access to all four floors. Interior finishes include but are not limited to: gypsum board walls; solid surface countertops; plastic laminate casework; resilient floor tile and carpet tile. Select areas will feature upgraded finishes, including: terrazzo flooring; wood veneer-clad departmental entryways and reception desks with integrated textile elements; a three-tiered social stair with tongue and groove wood plank flooring. The project is targeting LEED BD+C v4 Silver certification (minimum 50 points), with selected credits pursued under the LEED BD+C v4.1 compliance paths. All bids shall be submitted electronically through the bid submissions link on Lynn Imaging's website. Late bids shall not be acknowledged. The bids shall be guaranteed for a period of sixty days, and no bid may be withdrawn prior to the sixty-day period. Attendance at the Pre-Bid is not mandatory but bidders are strongly encouraged to attend.

Sub-Bidding

Educational

$25,000,000.00

Public - State/Provincial

New Construction, Site Work

364

36

2

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
135
Bidding Soon
1,524
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

January 26, 2026

Project location map

500 Newtown Pike, Lexington, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.