Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 26, 2025 at 7:00 PM
Updated November 27, 2025
Site work and new construction of an educational facility in Lexington, Kentucky. Completed plans call for the construction of a 87,352-square-foot, four-story above grade educational facility.
This is the second phase of a two-phase project. Phase 1, already under construction, includes earthwork, storm drainage, erosion control, new site utilities, demolition of existing site utilities, general requirements and LEED requirements for early work, concrete foundations, slab-on-grade, and structural steel framing. The Phase 2 Work consists of, but is not limited to, the following: Construction of a new four-story, 87,352 gross square foot facility on the Bluegrass Community and Technical College Newtown Campus in Lexington, Kentucky. Primary building systems consist of: brick veneer over cold-formed metal stud exterior walls for Levels 01-03; formed metal panel over cold-formed metal stud exterior walls at Level 04; a two-ply SBS modified bitumen roof system; geothermal water-source heat pumps with a dedicated outdoor air unit (DOAS) located within the building. Vertical circulation includes three egress stairwells and two machine room-less traction elevators providing access to all four floors. Interior finishes include but are not limited to: gypsum board walls; solid surface countertops; plastic laminate casework; resilient floor tile and carpet tile. Select areas will feature upgraded finishes, including: terrazzo flooring; wood veneer-clad departmental entryways and reception desks with integrated textile elements; a three-tiered social stair with tongue and groove wood plank flooring. The project is targeting LEED BD+C v4 Silver certification (minimum 50 points), with selected credits pursued under the LEED BD+C v4.1 compliance paths. All bids shall be submitted electronically through the bid submissions link on Lynn Imaging's website. Late bids shall not be acknowledged. The bids shall be guaranteed for a period of sixty days, and no bid may be withdrawn prior to the sixty-day period. Attendance at the Pre-Bid is not mandatory but bidders are strongly encouraged to attend.
Sub-Bidding
Educational
$25,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
January 26, 2026
500 Newtown Pike, Lexington, KY
Related To This Project
Lexington, KY
Bid Date: Dec 12 2025
Lexington, KY
Bid Date: Dec 11 2025
Lexington, KY
Bid Date: Dec 04 2025
Lexington, KY
Bid Date: Dec 11 2025
Lexington, KY
Bid Date: Dec 12 2025
Lexington, KY
Bid Date: Nov 18 2025
Lexington, KY
Bid Date: Nov 18 2025
Lexington, KY
Bid Date: Dec 08 2025
Lexington, KY
--
Lexington, KY
--
Lexington, KY
Bid Date: Dec 18 2025
Lexington, KY
Bid Date: Nov 26 2025
Lexington, KY
Bid Date: Dec 09 2025
Lexington, KY
Bid Date: Dec 09 2025
Lexington, KY
Bid Date: Oct 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
