BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2025 at 7:00 PM

Updated December 23, 2025

Site work for a communication facility in Hanceville, Alabama. Completed plans call for site work for a one-story above grade communication facility.

A. The work of this project will be completed in one phase. B. The General Contractor is solely responsible for project sequencing and scheduling. C. Work on site is not permitted to proceed until all required equipment has been procured and is ready for installation. 1. Contractor to coordinate off-site storage of equipment if all components of the project scope cannot be delivered to the project site simultaneously or within the on-site work timeline outlined below. D. Notify the Owner a minimum of 2 weeks in advance of when equipment has been procured and installation of equipment is ready to begin. Owner will provide written approval to proceed with on-site work. The scope of work includes, but is not limited to the following 1. Installation of three owner furnished, contractor installed EV charging stations and other associated conduit and conductors. The WSCC EV Charger Station (ACCS Project Number 2024 100 WSCC) Project Consists of installation of three owner furnished, contractor installed EV charging stations and other associated conduit and conductors. This project will provide EV charging capabilities for students, staff, faculty, and guests while on campus. Pre-qualification requirements: All interested general contractors shall contact the architect via the provided email to receive the criteria and the prequalification application for this project. Prequalification application forms should be emailed to the architect. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, and must show evidence of license before bidding; the bidder shall show such evidence by clearly displaying the current license number on the outside of the sealed envelope in which the proposal is delivered.

Award

Communication

$72,500.00

Public - State/Provincial

Site Work

5

8

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
65
Bidding Soon
741
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

January 19, 2026

Project location map

801 Main Street Northwest, Hanceville, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.