BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 5, 2026 at 7:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Evergreen, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Region: 1 Counties: Jefferson Work Days: 116 Project Sub Acc.No-24423 It is estimated that the total cost of all items in the bid will be: (X) Between $5,000,000 and $20,000,000 Resurfacing project with strategic shoulder widening along SH 74 between MP 6.9 and MP 12.5. Improvements include curb ramp and pedestrian crossing upgrades, a raised pedestrian crossing and bulb-out extension in downtown Evergreen, signing and striping improvements, guardrail replacement, and minor bridge repairs to Structures F-15-AC and F-15-AF. This project is located in Region 1 in Jefferson County. Project work consists of resurfacing, shoulder widening and other improvements on SH 74 from MP 6.9 - 12.5. Please contact Brian Kelly at 719-659-9447 for all project related questions. Guaranty: 5% of Total Bid Contract UDBE Goal: 0.00 % (a) The earliest date shall be March 2, 2026. (b) The latest date shall be May 4, 2026. CODOT: 003 - Region 1 - SH 74 Surface Treatment All questions shall be directed to the CDOT contacts listed above no later than 7:00 A.M. Monday of the week of bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (13.8%), WBE (6.9%), DBE (0%)

Award

Roads / Highways

$6,365,969.00

Public - State/Provincial

Paving, Site Work

431

7

17

11

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
149
Bidding Soon
1,808
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

March 2, 2026

Project location map

CO-74, Evergreen, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.