BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2026 at 7:00 PM

Updated February 20, 2026

Site work for a civil project in Groveland, California. Completed plans call for site work for a road / highway; and water / sewer project.

The project involves repairing storm damage within the Groveland Ranger District of Stanislaus National Forest. Work includes restoring areas impacted by severe weather events to ensure safe and functional conditions. Contractors are responsible for assessing and repairing damaged infrastructure, which may include roads, drainage systems, and other forest facilities affected by storms. All work must comply with applicable Forest Service standards and specifications. Site inspection prior to bidding is strongly recommended, as failure to inspect will not be grounds for claims after award. Disclosure of Magnitude of the Construction Project: Between $500,000 and $1,000,000 The Contractor shall begin performance within 10 calendar days and complete it within 250 calendar days. All Requests for Information (RFI's) shall be submitted to the Contracting Officer Tanya Torres on the attached RFI form not later than 0900 AM hours PDT, January 7th, 2026. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$763,931.00

Public - Federal

Site Work

14

9

2

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
6
Bidding Soon
316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

February 12, 2026

Project location map

Multiple Locations, Groveland, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.