Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 10, 2025 at 7:00 PM

Updated December 11, 2025

Site work for a sidewalk / parking lot in Madison, Arkansas. Working plans call for site work for a one-story above grade sidewalk / parking lot.

This project contains temporary erosion control, maintenance of traffic details, construction of a 5' wide concrete sidewalk with handrail and a 4' depth concrete ditch in the City of Madison, St. Francis County, Arkansas. The project includes two separate contracts: Main and Option. The contractor is expected to submit a bid for each contract but may only be awarded the Main contract based on the bid received and available funding. Main contract limits are between north of Courtney Cir and 5th Street. Option contract limits are between Hadley Dr and Courtney Cir. The time of completion for the Main contract is 75 calendar days including Saturdays, Sundays, and legal holidays. The overall time of completion for the Main and Option contracts is 90 calendar days including Saturdays, Sundays, and legal holidays. Complete digital bidding documents are available at www.iconiccg.com or www.questcdn.com. Reference Quest Number 8980738. Bids will only be received and accepted through vBid via Prospective bidders must be on the plan holder list through for bids to be accepted. Q&A 12/05/2025 at 5:00 PM CT Project has been cancelled

Final Planning

Sidewalks / Parking Lot

$200,000.00

Public - City

Site Work

36

7

2

8

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
59
Bidding Soon
806
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

January 8, 2026

Project location map

To be determined, Madison, AR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed