BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 10, 2025

Site work and paving for a bridge / tunnel in Lebanon, Ohio. Completed plans call for site work for a one-story above grade bridge / tunnel.

Sealed bids will be received for the Grog Run Road Bridge #147-0.47 Rehabilitation Project (WAR-TR 147-0.47). Only ODOT prequalified contractors are eligible to submit bids for this project, and pre-qualification status must be maintained at the time of bid, award, and throughout the contract. The "prime" contractor must perform at least 30 percent of the total original contract price. Each bid must contain the full name of the bidder and be accompanied by a bid bond for the full amount of the bid or a certified check equal to ten percent of the bid. If awarded, the contractor must file a performance bond for the amount of the contract. Bidders must comply with the Davis-Bacon Act for prevailing wage requirements for Federally funded projects. Attention is called to all requirements in the bid packet. No bidder may withdraw their bid within sixty days after the date of opening. All bids must be sealed, properly signed, and plainly marked for the project. Warren County reserves the right to reject any or all bids, waive irregularities, and to enter into a contract with the bidder offering the lowest and best bid. Proposal for the Grog Run Road Bridge #147-0.47 Rehabilitation Project. This work consists of rehabilitating the existing bridge and completing the related roadway items along Grog Run Road. The project shall be as per plans and specifications as provided by the Warren County Engineer. superstructure replacement of bridge war-tr147-0.47 over grog run. project includes minimal approach work, guardrail replacement, signing and striping, no work will occur in-stream Question Deadline 12/04/2025 Every request for such interpretation must be in writing and addressed to: Dominic Brigano, Warren County Engineer's Office, 210 West Main Street, Lebanon, Ohio, 45036, and to be given consideration must be received at least five days prior to the date fixed for the opening of bids. No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. Bid(10.0%), Performance(100.0%), Payment(100.0%), Certified Check SFN- 8333076

Post-Bid

Bridges / Tunnels

$500,000.00

Public - County

Paving, Site Work

37

5

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
117
Bidding Soon
2,463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2025

January 8, 2026

Project location map

Grog Run Road, Lebanon, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.