BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Site work and new construction of a mixed-use development in Portland, Texas. Completed plans call for the construction of a 87,000-square-foot, two-story above grade, 1,300-seat theater / auditorium; and 87,000-square-foot, one-story above grade educational facility.

The project involves the construction of a new Visual & Performing Arts and Career & Technical Education (CTE) Building at Gregory-Portland High School, covering approximately 87,000 gross square feet. The estimated construction budget is $65,000,000. The multipurpose facility includes a theater with about 1,300 seats on two levels, alongside support spaces and CTE areas dedicated to AV, Media, Technology, Academic, Administrative, and Community functions. The Construction Manager at Risk (CMAR) will provide both pre-construction and construction phase services. Pre-construction services will require design assistance, cost savings recommendations, constructability reviews, value engineering, scheduling, phasing, and logistics planning. The CMAR will participate in design meetings, review schematic and construction documents, manage subcontractor procurement, and deliver multiple cost estimates for each design phase. During construction, the CMAR is expected to execute the work in accordance with the Guaranteed Maximum Price (GMP) contract and after receiving Notice to Proceed. The CMAR solicitation will result in a single award to one contractor. The contract form will be the "Standard Form of Agreement between Owner and Construction Manager as Contractor Where the Basis of Payment is the ..." Proposals must be submitted in a sealed envelope or box, marked with the RFP number, and include five paper copies and one PDF copy on a flash drive or thumb drive. Proposals submitted by email, facsimile, or verbally will not be accepted. Question Deadline 12/09/2025 at 12:00 PM CT All questions or request for clarification pertaining to this RFP shall be submitted via email to Chris Casarez (ccasarez@g-pisd.org) with a Carbon Copy to: Jared Wood (wood@studioredarchitects.com) and Taneesa Morris (morris@studioredarchitects.com) Estimated Construction Budget: $ 65,000,000.00

GC Bidding

Theaters / Auditoriums

$65,000,000.00

Public - County

New Construction, Site Work

3

6

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
27
Bidding Soon
415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

February 9, 2026

Project location map

4601 Wildcat Dr, Portland, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.