Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 2, 2026 at 7:00 PM

Updated January 3, 2026

Site work for a sidewalk / parking lot in Long Lake, Minnesota. Completed plans call for site work for a one-story above grade sidewalk / parking lot.

This project includes parking lot and sidewalk replacement. Bidding documents, including the Proposal Form, Drawings and Specifications, will be available as specified. Proposals must be made on the bid forms supplied in the Project Manual. No oral, telegraphic, or telephonic proposals or modifications will be considered. Each bid must be accompanied by a certified check or acceptable bidder's bond payable to Independent School District #278 in the amount of five percent (5%) of the total bid. The successful bidder will be required to provide satisfactory Labor and Material Payment Bond and Performance Bond. The Owner reserves the right to accept or reject any or all bids and to waive informalities or irregularities in bidding. Bids may not be withdrawn within thirty (30) days after the scheduled opening time, without the Owner's consent. The Owner requires Substantial Completion of the project on or before August 14, 2026. ORONO HIGH SCHOOL 795 Old Crystal Bay Rd N, Orono, MN 55356 ORONO MIDDLE SCHOOL 800 Old Crystal Bay Rd N, Long Lake, MN 55356 SCHUMANN ELEMENTARY SCHOOL 765 Old Crystal Bay Rd N, Long Lake, MN 5535 No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to Independent School District #278 in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$714,701.00

Public - City

Site Work

9

10

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
83
Bidding Soon
1,597
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

January 12, 2026

Project location map

Multiple Locations, Long Lake, MN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed