BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work and paving for a civil project in West Paducah, Kentucky. Completed plans call for site work for a water / sewer project; bridge / tunnel; and for paving for a bridge / tunnel.

Mccracken County Fd06 073 New Route : New Route New Access Road From Ky-305 Near Ky-998 Extending West to the Ohio River Megapark, a Distance of 1.18 Miles. Grade, Drain & Surface With Bridge. Syp No. 01-08702.00. CALL NO. 311 PCN - DE0730NEW2512 FD06 073 NEW ROUTE The Department Will Only Accept Bidder Registration Forms From Contractors Who Are Prequalified in the Work Categories of the Particular Project. Registration Will Be Closed at 3:00 Pm on the Day Preceding the Letting. Question Deadline 12/10/2025 at 3:00 PM CT Questions about projects during the advertisement should be submitted in writing to the Division of Construction Procurement. This may be done by email to kytc.projectquestions@ky.gov. The deadline for posting answers will be 3:00 pm Eastern Daylight Time, the day preceding the Letting. KYDOT - Call 311 - Grade, Drain & Surface With Bridge - New Route New Access Road Incorporate an e-Ticketing Delivery Software for weighed aggregate material delivered to the project to report loads and provide daily running totals of weighed aggregate material for pay items and incidental work during the construction processes from the point of measurement and loading to the point of incorporation to the project. The KYCT (Kentucky Method for Cracking Test) and the IDEAL -RT/IDT -HT test results will help determine if the mixture is susceptible to cracking and rutting. During the experimental phase, data will be gathered and analyzed by the Department to determine the durability and stability of the bituminous mixes. Additionally, the data will help the Department to create future performance -based specifications which will include the KYCT and field rutting test methods. The reconstruction, elevation, and extension of the existing road between the Kentucky Highway 305/358 corridor and Kentucky Highway 1420. The project would raise and extend "Bobo Road" with fill material to allow the roadway to remain open during high water events. The re-constructed road would require the use of one 12' by 8' concrete box culvert and equalizer pipe in Withrow Creek, one 54" pipe culvert and 2 equalizer pipes in an un-named tributary to Massac Creek, and 5 additional enclosed culverts to maintain site hydrology. The construction of the proposed road improvement and extension would UHTXLUHWKH GLVFKDUJH RI ILOOPDWHULDOWKDWZRXOGpermanently impact 8.56 acres of wetlands and 518 linear feet of streams and temporarily impact 2.16 acres of wetlands and 133 linear feet of streams.

Post-Bid

Bridges / Tunnels

$4,000,000.00

Public - State/Provincial

Paving, Site Work

73

9

38

6

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
47
Bidding Soon
737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2025

February 9, 2026

Project location map

Bobo Rd, West Paducah, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.