BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 18, 2025

Site work, remodeling and addition to a fire / police facility in Dickinson, North Dakota. Completed plans call for the addition of a 2,700-square-foot, one-story above grade fire / police facility; and one-story above grade fire / police facility.

Project work consists of but is not limited to the following: ARFF Building Expansion will consist of an approximate 2,700-sf foot addition to the existing building, interior remodeling and miscellaneous site improvements. Construction for this project shall be completed by December 1, 2026 for all bid schedules. FAA AIP No. 3-38-0013-054-2026 Timetables Goals for minority participation for each trade: 1.3% Goals for female participation in each trade: 6.9%

Post-Bid

Fire / Police

$1,000,000.00

Public - Federal

Addition, Remodeling, Site Work

68

37

4

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
5
Bidding Soon
64
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2025

January 9, 2026

Project location map

To Be Determined, Dickinson, ND


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.