BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a development in Cuba, Illinois. Completed plans call for site work for a development.

Tenders are invited for providing all labor, supervision, vehicles, tools and materials, including all transportation required, to perform maintenance, repair, operation of agricultural equipment, moving of pipe, removing fences, cleaning culverts, clearing vegetation, and other work as specified herein and required from time to time, at the Metropolitan Water Reclamation District’s Prairie Plan Site in Fulton County, Illinois. The Contract shall commence upon approval of the Contractor’s Bond and terminate December 31, 2028, or upon expenditure of available funds, whichever occurs sooner. Group A – Agricultural Management: providing one (1) operating Engineer, one (1) agricultural laborer, and other classifications of labor, for the operation, maintenance, and repair of facilities and agricultural equipment. Group B – Agricultural Fieldside Mowing: providing labor and equipment to perform agricultural mowing services for a combined area of approximately 1,600 acres. Group C – Fence Installation and Removal: providing labor, equipment, parts, and material to install and remove woven or barbed wire fence. There is no bid deposit for this Contract. A Contractor's bond will be required. Please refer to the CONTRACTOR’S BOND section in the Agreement for additional information about this requirement. The contact person for this Contract is Mr. Raphael Frost. Mr. Frost will provide online responses to online inquiries The Metropolitan Water Reclamation District of Greater Chicago reserves the right to reject any or all Proposals. The estimated cost of the work under this Contract is not to exceed the following amounts: Group A – Agricultural Management $732,000.00 Group B – Agricultural Fieldside Mowing $375,000.00 Group C – Fence Installation and Removal $153,000.00 Bidresult 1.Group A C&J MOWING AND FENCING-$923,760.00 2.Group B C&J MOWING AND FENCING-$450,773.1 3.Group C C&J MOWING AND FENCING-$210,800.00

Award

Conservation and Development

$1,260,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
135
Bidding Soon
1,360
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

May 18, 2026

Project location map

To be determined, Cuba, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.