BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Renovation of an educational facility in Carbondale, Illinois. Working plans call for the renovation of a educational facility.

The Southern Illinois University - Carbondale, is a 393-building facility established in 1832. The scope of work provides for constructing a Chiller Plant at Southern Illinois University's Carbondale campus near the Neckers Building and connecting the plant to the existing campus chilled water loop. The plant will include one water-cooled centrifugal chiller and associated cooling tower, with the flexibility to add up to two additional chillers and cooling towers as funding allows. This Chiller Plant shall be of similar design and construction as the new Chiller Plant being constructed at the Communications Building. The work shall also include removing two stoker coal boilers in the Power Plant and replacing with one or two gasfired packaged boilers, as funding allows, featuring dual-fuel technology, including the installation of fuel storage tank(s) appropriately sized for the number of boilers installed, new feed-water pumps, and a deaerator system. Outdated infrastructure shall be demolished as part of the work, as funding allows, including the old incinerator building and bag-house structures. The existing smokestack shall remain. The work shall include associated controls tying into the campus Building Automation System, along with any necessary electrical modifications to support the overall work being done at both the Chiller Plant and the Power Plant. Hazardous materials may be encountered. If applicable, the design will need to comply with the Illinois Stretch Energy Code. The A/E will need to determine if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate. The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesign of the project should bids received exceed project funding. The interviews for this project are tentatively scheduled for February 23, 2026. MBE Goal: 0% WBE Goal: 0% Combined MBE/WBE Goals: 20% Combined PBE/VBE Goals: 3%.

Final Planning

Educational

$37,000,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
87
Bidding Soon
1,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2026

Project location map

1263 Lincoln Dr, Carbondale, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.