Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 22, 2025 at 7:00 PM
Updated December 23, 2025
Demolition, site work and new construction of a laboratory facility in Carbondale, Illinois. Conceptual plans call for the demolition of a laboratory facility; for the construction of a laboratory facility; and for site work for a laboratory facility.
The scope of work provides for construction of a new state-of-the-art public health laboratory facility of approximately 20,000 gross square feet to serve the State of Illinois. The facility must meet federal bio-safety requirements to continue to secure federal funds, including all standards set by the Biosafety in Microbiology and Biomedical Laboratories (BMBL) for BSL-2 and BSL-3 laboratories. Biosafety Level 3 (BSL-3) lab must be inspected and certified by the Online for use with select agent testing and registry. BSL-3 lab construction must be engineered and prepared to meet standards, pass inspection and be certified according to guidelines from federal agencies, including the Online and the NIH, and meet performance verification and compliance with applicable safety and security protocols, including requirements for emergency egress and decontamination zones. The facility will be secure with access controls and should have stand-alone backup generator power throughout, and uninterruptible power supplies for critical equipment. The facility should have modern security systems, including door access controls, badge readers, and security cameras. Security systems should interface with the State of Illinois monitoring software. The scope of work should also include gas infrastructure installations as needed for laboratories, including argon, carbon dioxide, and nitrogen gasses for equipment such as incubators and mass spectrometers. In addition, each lab will need deionized water and independent temperature and humidity control systems. The existing laboratory must always remain in operations and steps need to be taken to prevent construction debris from contaminating the existing laboratory spaces. The existing laboratory will be demolished after the new laboratory is occupied. Hazardous materials may be encountered. The area shall be back-filled, graded and seeded. This will be done as a separate bid package. The teams should be able to demonstrate three completed BSL3 laboratory projects within the last five years. Teams with more experience may be given preference. A minimum of LEED Silver certification or equivalent green building standard certification will be required. The selected A/E will be expected to complete an approved design within 12-18 months of the executed contract. An independent third-party commissioning agent will be selected and assigned to this project. The A/E will need to determine if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate. The A/E is required to coordinate all telecommunications and networking requirements with the Department of Innovation and Technology (DoIT) during design and construction. The A/E is encouraged to include independent cost estimators on their teams to verify estimates are in line with current market conditions to avoid project bids that exceed the available funding for the project. A/E estimates should be updated and verified at each stage of the project in accordance with the Design and Construction Manual. Designers are reminded that their Professional Services Agreements make them responsible for providing a design that is within budget, and they can be held responsible for redesign of the project should bids received exceed project funding. MBE Goal:0% WBE Goal: 0% Combined MBE/WBE Goals: 20% Some level of participation from both MBE and WBE firms is required to satisfy this goal (this requires including one or more MBE AND one or more WBE firms on the team). PBE Goal: 0% VBE Goal: 0% Combined PBE/VBE Goals: 3% APPROPRIATED AMOUNT: $4,000,000 PROFESSIONAL LIABILITY INSURANCE REQUIRED: $5,000,000 The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."
Conceptual
Laboratories
$44,947,700.00
Public - State/Provincial
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2027
573 S Oakland Ave, Carbondale, IL
Related To This Project
Carbondale, IL
--
Carbondale, IL
Bid Date: Feb 27 2026
Carbondale, IL
Bid Date: Jan 22 2026
Carbondale, IL
Bid Date: Jan 16 2026
Carbondale, IL
Bid Date: Dec 15 2025
Carbondale, IL
Bid Date: Dec 15 2025
Carbondale, IL
Bid Date: Jan 16 2026
Carbondale, IL
--
Carbondale, IL
--
Carbondale, IL
Bid Date: Nov 12 2025
Carbondale, IL
Bid Date: Nov 25 2025
Carbondale, IL
Bid Date: Nov 25 2025
Carbondale, IL
Bid Date: Nov 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.