Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 4, 2026 at 7:00 PM
Updated March 5, 2026
Site work and new construction of a transportation facility in Ocala, Florida. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.
ProRFx Number: ITB11242500000138 The Work specified herein shall include construction of all streets, stormwater, traffic, water, sanitary sewer, and reclaimed water systems in the City of Ocala, City Limits or Service Area, as well as all modifications, rehabilitation of or connection to existing City of Ocala streets, stormwater, traffic, water, sanitary sewer, and reclaimed watersystems. EXPERIENCE, REFERENCE, AND LICENSING REQUIREMENTS 1. Licensing Requirement: Contractor must be a certified licensed general or building Contractor in the State of Florida to submit a bid for this project. Proof of valid licensing per Florida Department of Business and Professional Regulations will be verified. 2. Experience Requirement: Contractor must possess a minimum of 5 years' experience in providing commercial/industrial building construction services. Bidders must provide three (3) work projects completed within this timeframe with bid submission. 3. Reference Requirement: Contractor must provide three (3) verifiable professional references. BOND REQUIREMENTS 1. Bid Bond: Bid security equal to five percent (5%) of the total bid amount must accompany each bid. Bid bond will be uploaded in the section of this listing labeled "Bid Bond." The original document will be maintained by the Bidder unless requested to produce by the City. 2. Performance Bond: The successful Bidder must submit a recorded Public Construction bond in the amount of 100% percent of the contract price. This is obtained to ensure completion of the obligations under the third-party contract. 3. Payment Bond: A payment bond is obtained to ensure that the contractor will pay all people supplying labor and material for the third-party contract by law. The payment bond is set for 50% of the contract price according to FTA requirement. 4. Maintenance and Guarantee Bond: The successful Bidder will also be required to furnish a Maintenance and Guarantee Bond for 10% of the total project value, prior to final payment, for a period of three year(s) for labor and three year(s) for materials from the date of final completion. 5. All bond costs shall be included in the lump sum price. PRICING AND AWARD 1. Bids will be received on a lump sum basis. Lump sum amount must include all direct and indirect costs to complete the project. 2. Award will be made to the lowest bidder meeting all requirements outlined herein. 3. The permit allowance is $2,500 for this project. Include this amount in your lump sum bid amount. 4. The City reserves the right to reject any or all bids, including without limitation the rights to reject any or all non-conforming, non-responsive, unbalanced, or conditional bids. The City further reserves the right to reject the bid of any bidder whom it finds, after reasonable inquiry and evaluation, to be non-responsive. 5. The City of Ocala reserves the right to waive informalities and irregularities. 6. Bidder will honor bid until approved by City Council up to ninety (90) days after award of solicitation. The Contractor shall provide all labor, materials, equipment, and services necessary for the construction of the Union Station kiosk. The scope of work includes but is not limited to: o Site preparation and demolition (if necessary) o Utility connections and infrastructure improvements o Construction of a +-500-sf structure in accordance with the approved design o Installation of public and employee restrooms, including plumbing and fixtures o Electrical and lighting installation o HVAC installation o Interior and exterior finishes as per specifications o Fully functioning fire alarm system is required per sheets FP-000, FP-201 and FP-901 o Contractor to coordinate final camera locations and submit specifications for approval with the client. o Railing will need to match bronze railing by the railroad tracks. o Compliance with all applicable building codes and ADA requirements o Final inspection and project closeout 2. The Contractor shall provide a project schedule. 3. The contract shall provide a schedule of values (breakdown of all estimated costs). 4. Construction shall be completed. Construction Time: The contract time to Substantial Completion is ninety (90) calendar days of issued Notice to Proceed. The contract time to Final Completion is 30 calendar days after substantial Completion. committed to a minimum of 2.55% DBE Formal Question Due By: 1/21/2026 5:00:00 PM EST
Award
Transportation Terminals
$690,087.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2026
March 4, 2026
501 NE 1st Ave, Ocala, FL
Related To This Project
Ocala, FL
Bid Date: Jan 07 2026
Ocala, FL
Bid Date: Dec 18 2025
Ocala, FL
Bid Date: Jan 05 2026
Ocala, FL
Bid Date: Jan 07 2026
Ocala, FL
Bid Date: Jan 09 2026
Ocala, FL
Bid Date: Jan 08 2026
Ocala, FL
Bid Date: Feb 06 2026
Ocala, FL
Bid Date: Dec 03 2025
Ocala, FL
Bid Date: Dec 17 2025
Ocala, FL
Bid Date: Jan 22 2026
Ocala, FL
Bid Date: Nov 24 2025
Ocala, FL
Bid Date: Nov 24 2025
Ocala, FL
Bid Date: Nov 24 2025
Ocala, FL
Bid Date: Nov 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
