BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 26, 2025 at 7:00 PM

Updated December 27, 2025

Site work and new construction of a transportation facility in Watertown, South Dakota. Conceptual plans call for the construction of a transportation facility.

The scope of work covers the design and construction of new aircraft hangars and associated taxilane, pavements, and utilities in a designated development zone. This includes construction of various types of hangars (such as T-hangars, box hangars, and corporate hangars with business frontage) with proper drainage, development of a new taxilane and connecting pavements for safe aircraft access, extension and installation of electrical, gas, water, and sanitary sewer utilities, and construction of new vehicle access roads and parking areas to support the hangar facility. All work must comply with Federal Aviation Administration advisory circulars and relevant local codes and ordinances. Durable materials such as fully enclosed steel structures are preferred, and pavement must be designed to FAA specifications for the identified critical aircraft. Instructions to bidders specify that proposals should be submitted electronically in PDF format and a hard copy must be delivered as outlined. Proposals should include a cover letter, executive summary, proposer qualifications, project approach, project team details, development plan with drawings, financial plan, and project timeline. Proposals should be limited to 25 pages. Proposals will be evaluated on financial strength, experience, design and layout, project schedule, and overall benefit to the airport. The City reserves the right to reject any or all proposals and to proceed in the best interest of the airport. The selected firm must comply with applicable federal requirements, including consistency with the Airport Layout Plan, environmental laws, Buy American and Build America Acts, civil rights laws, labor standards, and FAA design standards. No reimbursement will be available for improvements not shown on the approved ALP at the time of construction, and construction may not begin until all required environmental determinations are issued. Questions deadline: 12/19/25, All questions must be submitted in writing via email to: Ian Meriwether-Chalfant, Airport Manager, Watertown Regional Airport, Email: Imeriwether@watertownsd.us As of December 26, 2025, an issuance of short-listed firms has not been released. A developer selection has not been disclosed.

Conceptual

Transportation Terminals

$4,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
0
Bidding Soon
164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 26, 2025

December 7, 2026

Project location map

550 Airport Dr, Watertown, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.