Site work for a water / sewer project in Kent, Washington. Completed plans call for site work for a water / sewer project.

For construction of the hwd project 25-3 north hill water main replacement. The scope of work includes the construction of approximately 7,790 lf of 8-inch and smaller di water main including new fittings, valves, hydrants, services, and other water-related appurtenances. Work shall also include, but is not limited to: mobilization, temporary erosion and sedimentation control (tesc), construction surveying, temporary traffic control, connection to the existing water system, saw cutting, hma trench patch, planning bituminous pavement, hma overlay, existing pipe abandonment and surface resto-ration. All bids shall be accompanied by a bid deposit in the form of a postal money order, certified check, cashier's check, or surety bond in an amount no less than five percent (5%) of the amount of such bid. The bid deposit shall be given as guarantee that the bidder shall execute the contract, if it be awarded to such bidder, in conformity with the contract documents and that the bidder shall provide surety bond or bonds as specified therein within ten (10) calendar days after notification of the award of the contract to the bidder. Should the success-ful bidder fail to enter into such contract within the time stated in the specifications, the bid depos-it shall be forfeited to highline water district. Highline water district reserves the right to reject any and all bids and will accept the bid deemed in the best interest of the district. The district also reserves the right to waive informalities in the bidding and to delay the award of the bid for a period up to sixty (60) days from the date of bid opening. Document Acquisition Notes : Questions regarding the plans, specifications, or other items pertaining to the project shall be directed to the engineer bidders are required to have their own copies of the standard specifications for road bridge, and municipal construction 2025 edition, prepared by the washington state department of transportation/american public works association. Question Deadline 12/04/2025 Prospective Bidders desiring an explanation or interpretation of the Bid Documents, shall request the explanation or interpretation in writing by close of business, five (5) business days preceding the bid opening to allow a written reply to reach all prospective Bidders before the submission of their Bids.

GC Bidding

Water / Sewer

$4,000,000.00

Public - City

Site Work

29

9

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
110
Bidding Soon
1,704
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.