Published June 7, 2026 at 8:00 PM

Updated June 11, 2026

Site work and renovation of a water / sewer project in Ware, Massachusetts. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

A. The work of this Contract is located at the William A. Brutsch Water Treatment Facility (BWTF) at 735 Belchertown Road (Route 9) in Ware, MA, 01082. B. Description of the Existing Sodium Hypochlorite Feed System 1. Sodium Hypochlorite is added as one of two primary disinfectants as required for unfiltered drinking water supplies. There are two 3,000 gallon fiber-reinforced polymer (FRP) tanks for storage of sodium hypochlorite. There are three metering pumps to feed sodium hypochlorite to the finished water line. One of three metering pumps feeds sodium hypochlorite to the injection location in the UV room, the other two are backups. 2. There are two fill pipes for the Sodium Hypochlorite bulk storage tanks that start in the fill box located on the outside of the Chemical Building. There are two 2- inch Chlorinated Polyvinylchloride (CPVC) fill lines, one for each bulk storage tank. From the bulk storage tanks to the metering pumps there is a 3-inch CPVC header with a connection to each metering pumps. From the three metering pumps there are two lines to the injection location in the basement of the UV building. The Work Includes, but is Not Limited to, Upgrades to the Sodium Hypochlorite Chemical Feed Systems at the Brutsch Water Treatment Facility, Including the Replacement of Two Bulk Storage Tanks, Cpvc Piping, Accessories, Metering Pumps, Control Panels And Chemical Containment Liner. The Estimated Project Cost is: $983,000.00. Each General Bid Must Be Accompanied by a Current Certificate of Eligibility Issued by the Division of Capital Asset Management And Maintenance (Dcamm) Showing That the Bidder Has the Classification and Capacity Rating to Perform the Work and an Update Statement. In Order to Be Eligible to Bid, a General Bidder Must Be Certified in Either of the Following Categories of Work: Sewage and Water Treatment Plants Mechanical Systems Each Filed Sub-bid Must Be Accompanied by a Current Certificate of Eligibility Issued by Dcamm Showing That the Sub-bidder Has Been Certified to Participate on Public Construction Projects and Perform the Class of Work for Which the Sub-bid is Submitted. Each Filed Sub-bid Must Also Be Accompanied With an Update Statement. Filed Sub-bids Will Be Required on the Following Classes Of Work: Division Sub-trades 9 Painting 16 Electrical Work This Contract is Subject to N/a Mbe and N/a Wbe Participation Requirement. Filed Sub-bids Will Be Received on the Supplier Portal Under Event #6627 - Brutsch Water Treatment Facility Sodium Hypochlorite

Post-Bid

Water / Sewer

$983,000.00

Public - State/Provincial

Renovation, Site Work

13

16

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
931
Active Projects
555
Bidding Soon
6,162
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

June 26, 2026

Project location map

735 Belchertown Rd, Ware, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.