BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 28, 2026 at 7:00 PM

Updated January 29, 2026

Site work for a civil project in Missouri City, Texas. Completed plans call for site work for a 55,040-square-foot road / highway; water / sewer project; and water / sewer project.

Harmony Public Schools ("HPS") is seeking competitive sealed proposals from qualified offerors to provide construction services for "public infrastructure work needed to serve the 55,040 square foot elementary school in Missouri City, Texas". The construction scope consists of, but is not limited to, sanitary sewer lift station construction, generator installation, public water line, public sanitary force main installation, traffic signal installation, right turn lane construction, roadway striping, and other related work as specified in the project documents (#HPS2526_HSA Missouri City PII). Construction scope consists of but is not limited to concrete, road and driveway, electrical, mechanical, plumbing, landscaping, and other related work as specified in the project documents. (#HPS2526_HSA Missouri City GU). Project No. LJAS001-4026-2201.205, 653.24.CV.021, 06-22-008 THE SW CORNER OF SH 6 & TEAL BEND BLVD. MISSOURI CITY, FORT BEND COUNTY TX 77545 The project involves the construction and installation of a sanitary sewer lift station, public water line, public sanitary force main, a traffic signal, right turn lane, roadway striping, and other related work. The scope includes site preparation and grading, foundation and structural systems, mechanical, electrical, and plumbing systems (MEP), site utilities and stormwater management, deceleration lane, and traffic signal installation. All work must comply with applicable local, state, and federal building codes and regulations. Prospective bidders are required to submit detailed cost estimates (including labor, materials, and contingencies), project schedules with key milestones and completion dates, proof of qualifications and experience with similar projects, references from past clients, proof of insurance and bonding, and safety plans and quality control measures. Proposals will be evaluated based on cost competitiveness, relevant experience with similar ground-up construction projects, ability to meet project schedules and deadlines, safety and quality control protocols, references and past performance, and compliance with project specifications. Question Deadline 12/09/2025 at 12:00 PM CT Estimated Budget: Project Timeline: Construction Start Date: February 2026 Estimated Completion Date: February 2027 Project Duration: 12 months The anticipated budget for the project is approximately $1.6 million. This estimate includes construction costs, materials, labor, equipment, and contingencies.

Bid Results

Water / Sewer

$1,682,870.00

Public - State/Provincial

Site Work

101

3

38

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
356
Active Projects
165
Bidding Soon
2,669
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2025

February 2, 2026

Project location map

12105 Hwy 6, Missouri City, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.