BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Renovation of a power facility in Milan, Michigan. Completed plans call for the renovation of a one-story above grade power facility.

The project requires the contractor to provide a temporary SurgeDeaerator System to maintain continuous steam service at FCI Milan, including all piping, valves, tie in points, chemical treatment, and labor for installation and removal of the system. The contractor must remove the existing combined surge and deaerator tank from the Central Utility Plant, dispose of it properly, and supply all necessary equipment, materials, and labor for removal. A new two-tank system with a stainless surge tank and DA System must be provided and installed, including all schedule 80 piping, forged fittings, valves, tie in points, controls, wiring, and labor. The surge tank must be capable of bypassing the deaerator tank and vice versa for system redundancy. All work must conform to local, state, and federal regulations. Access to specifications and drawings requires registration at sam.gov. This is a 100 percent small business set-aside, and interested bidders must be registered as small businesses in sam.gov. Bids must be uploaded electronically as specified in the instructions to bidders.

Sub-Bidding

Power Plant

$5,000,000.00

Public - Federal

Renovation

6

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
364
Active Projects
164
Bidding Soon
2,622
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2025

February 10, 2026

Project location map

To Be Determined, Milan, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.