Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 18, 2026 at 8:00 PM

Updated September 24, 2026

Site work and new construction of a power facility in Whati, Northwest Territories. Design plans call for the construction of a power facility; and for site work for a power facility.

Construction of a new generation power plant that will consists of a three-generator set arrangement: (1) 300 kW & (2) 600 kW diesel generators and all associated equipment. TIMELINE: Request for proposal to provide design services for the project has closed and a preferred proponent is chosen. Tender and construction timelines are yet to be determined. Further update in early 2027.

Design

Power Plant

$2,000,000.00

Public - State/Provincial

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
4
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

Multiple Locations, Whati, NT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed