BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Site work for a road / highway in Atlanta, Georgia. Completed plans call for site work for a road / highway.

GDOT reserves the right to reject the submittal of the offending Respondent. The Scope of Work contemplated and covered in this bid proposal consists of the furnishing of all labor, materials, equipment, and incidentals required for the removal of 4 USTs, 4 - 10,000 gal. gasoline tanks (2 USTs regular,1 UST premium, 1 UST diesel), associated piping, venting, and bollards. The work includes but is not limited to: 1. All UST removal efforts shall be provided under the guidance of the sub-contracted GDOT Right of Way prequalified UST consultant. 2. Remove and dispose of unverified quantity of existing liquids within 4 USTs, 4 - 10,000 gal. gasoline tanks (2 USTs regular,1 UST premium, 1 UST diesel), associated piping, venting, and bollards. At the time of the site visit, the UST tank fill ports were capped, and the supplier evacuated the USTs. Assume collectively 4,000 gallons of residual fuel contents remain in the tanks which will require proper removal and disposal. 3. Prior to removing the USTs from the ground, wash, and triple rinse USTs after proper removal of remaining liquids. Submit documentation provided by specialty UST product removal/wash contractor. 4. Remove the concrete slab covering the tanks and associated piping to facilitate removal of USTs. Remove additional concrete paving to access product piping. The paving removal for concrete is included in the quantifies as noted as removal/disposal items in the demolition requirements. 5. Remove 4 USTs, 4 - 10,000 gal. gasoline tanks (2 USTs regular,1 UST premium, 1 UST diesel), associated piping, venting, and bollards. Backfill and compact with new, non-contaminated, acceptable soil. 6. Provide field sampling and lab analyses analysis for all tanks, product piping lines, and soil piles as required by regulation. 7. Conduct Water Resources Survey and prepare UST Closure Report, including Form 7530-1. Submit the UST Closure Report to the Site Inspector for review. 8. Submit photographic documentation to the Site Inspector of the tanks following their removal from the tank pit, as well as the empty tank pit. 9. Submit documentation of disposal of the tanks to the Site Inspector. 10. After tank and piping removal and fill is completed, the area where the paving was demolished to access tanks shall be graded as required to promote drainage, eliminate ponding, and blend topographically with the remainder of the paving. 11. Areas where the paving, foundations, or other structure components are removed shall be filled with clean compacted soil to a level approximately 6" below the finish elevation. Provide compacted gravel fill (crush-nrun), 6" minimum, as required to maintain the demolition area level with the elevation of the adjacent grade. The final grade must be such that the demolition area will drain properly. 12. The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to land disturbing activities. The Demolition Contractor is required to follow all erosion, runoff, and sediment control practices, including erecting of silt fencing or other measures as necessary, as required by local, state, and federal regulations. All erosions control measures shall comply with 2019 Georgia Code, TITLE 12 - Conservation and Natural Resources, Chapter 7 - Control of Soil Erosion and Sedimentation.

Award

Roads / Highways

$99,000.00

Public - State/Provincial

Site Work

7

4

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
143
Bidding Soon
1,908
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.