BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2026 at 7:00 PM

Updated January 6, 2026

Renovation of a medical facility in Denver, Colorado. Completed plans call for the renovation of a medical facility.

Description 2023-098M23 Building 118 BldgChiller and Building 35 Water S The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information. Notice no -2026000081 ADDENDA: Owner/architect initiated addenda shall not be issued later than two (2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form. Request for Clarifications Due 12/02/2025 by 1:00PM Communication regarding the project during the procurement, outside of this submission process or scheduled procurement milestones is not permitted. POINT OF CONTACT/CLARIFICATION Name: Ms. Jamie Gott Agency: Colorado Department of Human Services (CDHS) Email Address: jamie.gott@state.co.us SCOPE ITEM 1C - CONDENSATE PUMPS: • REMOVE AND REPLACE THREE (3) EXISTING ELECTRIC DRIVE CONDENSATE RECEIVER / TRANSFER PUMPS WITH NEW ELECTRIC DRIVE PUMPS. EXISTING EQUIPMENT SUPPORTS, PIPING, AND SERVICE ISOLATION VALVES TO BE UTILIZED; HOWEVER, MODIFICATIONS TO PIPE SUCTION AND DISCHARGE WILL BE REQUIRED. • REPLACE EXISTING (2) TWO ELECTRIC AND (2) TWO STEAM DRIVE BOILER FEEDWATER PUMPS, INCLUDING HEADER PIPING AND ASSOCIATED SERVICE ISOLATION VALVES. ELECTRIC DRIVE PUMPS SHALL BE NEW PUMP AND MOTOR ASSEMBLY. STEAM TURBINES SHALL BE REMOVED, SHIPPED TO REFURBISH FACILITY, AND REINSTALLED UPON RETURN. EXISTING EQUIPMENT SUPPORTS AND PIPING TO BE UTILIZED; HOWEVER, MODIFICATIONS TO PIPE SUCTION AND DISCHARGE WILL BE REQUIRED. PUMPS CONNECTED TO STEAM TURBINES SHALL BE NEW. • SEQUENCING OF PUMP REPLACEMENTS SHALL BE COORDINATED WITH ELECTRICAL EQUIPMENT MOTOR CONTROL CENTER REPLACEMENT PROJECT TO NOT RENDER ANY GIVEN PUMP OUT OF SERVICE DURING ASSOCIATED MCC 1 THRU 3 OUTAGES. The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project.

Award

Medical

$1,452,430.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
2
Bidding Soon
970
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.