Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 7, 2026 at 7:00 PM

Updated January 8, 2026

Renovation of a data center facility in Edmond, Oklahoma. Completed plans call for the renovation of a data center facility.

Replacement of existing flywheel style UPSs with new Valve Regulated Lead-Acid (VRLA) UPSs. Controls design to integrate into existing BAS system and BACNET system. THE PROJECT SCOPE CONSISTS OF REPLACING EXISTING UNINTERRUPTIBLE POWER ELECTRICAL SYSTEMS. NEW ELECTRICAL SYSTEMS ARE TO MEET CURRENT LOAD CONDITIONS. THE SCOPE OF WORK INCLUDES THE FOLLOWING: REPLACEMENT OF EXISTING FLYWHEEL STYLE UPS SYSTEMS WITH BATTERY-BASED UPS SYSTEMS

Post-Bid

Data Centers

$441,395.00

Public - State/Provincial

Renovation

8

11

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
82
Bidding Soon
923
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2026

February 5, 2026

Project location map

800 E 2nd St, Edmond, OK

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed