BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2026 at 7:00 PM

Updated February 27, 2026

Site work and new construction of a civil project in West Brookfield, Massachusetts. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.

Contractor Qualification DCAMM Certificate The Work of this Contract generally includes, but is not limited to, upgrades to the Leland Road Treatment Facility and Wellfield, including a 41'-4" by 29'-4" double wythe masonry building for the Leland Road Water Treatment Facility (WTF) with three (3) GreensandPlus filtration vessels for iron and manganese removal, a below grade spent backwash tank, backwash supply tank, and pipe gallery. Building components including HVAC, plumbing, SCADA, and electrical. Other upgrades include installation of a sodium hypochlorite disinfection system in the existing WTF building on site, and new submersible well pumps and motors. Site work include installation of 8-inch ductile iron water main and associated valves, hydrants, fittings, and appurtenances, approximately 187 feet of 24-inch diameter D.I. water main for 4-log virus inactivation, relocation of propane tanks and associated piping, electrical, grading, chain link fence, gravel driveway, stormwater controls, erosion controls, and miscellaneous site work. All work shall be completed within 510 consecutive calendar days of the date fixed in the Notice to Proceed. Each bid and sub-bid shall be accompanied by a bid security in the amount of 5% of the total bid amount. A Performance Bond and Labor and Materials Payment Bond, each in the amount of 100% of the Contract Price, will be required. Massachusetts Minimum Wage Rates as well as Federal Minimum Wage Rates apply to this project. All questions and requests for information about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer, Tata & Howard, Inc., attention Juliette Burcham, through email at LelandWTFbid@tataandhoward.com. Question Deadline 01/14/2026 Addendum #1-#5 have been issued as of 1-27-2026.

Award

Water / Sewer

$5,872,475.00

Public - City

New Construction, Site Work

55

44

28

4

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
14
Bidding Soon
2,934
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2026

March 23, 2026

Project location map

16 Leland Rd, West Brookfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.