Site work for a water / sewer project in Spruce Grove, Alberta. Completed plans call for site work for a water / sewer project.

The watermain rehabilitation for this program is located along King Street, from Highway 16A to Agrena Road. This corridor is highly congested and serves as one of the primary arterial roadways within the City Center. As such, traffic accommodation and public communication will require careful planning and execution and are of the highest priority for the City of Spruce Grove. The sanitary and storm rehabilitation components are located further north along King Street, extending from Wellington Crescent to Brookside Avenue. While this segment experiences less congestion, it remains a key arterial roadway. Traffic accommodation and public communication will still be required; however, the approach will be more residential in nature rather than business-focused. Within the project limits, the watermain scope includes approximately 835 linear meters of replacement with a 300mm diameter PVC main, including all associated valving, hydrants, and curb stop (CC) replacements. The primary objective of this work is to abandon redundant mains and provide compliant connections that meet current City standards, while ensuring adequate system isolation for operational requirements. The sanitary and storm upgrades include approximately 60 linear meters of storm main replacement at Wellington Crescent, upsizing from 375 mm to 525 mm, along with associated manhole upgrades and catch basin improvements. The sanitary sewer on King Street will be upgraded from 375 mm to 600 mm, with approximately 210 linear meters of replacement. All connecting manholes will be removed and replaced to match proposed design elevations, and all existing sanitary service connections will be reinstated. All construction activities will include associated landscaping and road restoration. Temporary water servicing and sanitary sewer bypass systems will also be required and are included within the project scope, in accordance with the details outlined in the drawing package. Documents can be obtained from https://selecteng.bidsandtenders.ca/ Question Deadline 04/14/2026

Bid Results

Water / Sewer

$3,081,276.00

Public - City

Site Work

11

13

2

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
61
Bidding Soon
606
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 29, 2026

Project location map

King St, Spruce Grove, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.