Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2026 at 7:00 PM
Updated February 5, 2026
Site work and paving for a sidewalk / parking lot in San Antonio, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The City of San Antonio (City), Center City Development & Operations (CCDO) is issuing a Request for Competitive Sealed Proposals (RFCSP) for qualified firms (Respondents) to provide construction services for the River Walk Channel Improvements: Staircase and Sidewalks (Project). The project consists of the renovations of the Riverwalk and other work indicated in the contract documents. The Project consists of repair and rehabilitation as part of the Center City Development & Operations (CCDO) Department's continuing efforts to improve and maintain the infrastructure and the experience of the San Antonio River Walk. CCDO will be utilizing the construction services of a general contractor at several areas along the River Walk utilizing the competitive sealed proposal delivery method for construction. This construction project includes, but is not limited to, the construction of sidewalks, steps, ramps, retaining walls, handrails, and any other work required for the completion of the project as designed in the project plans and specifications. Question Deadline 12/19/2025 at 4:00 PM CT Respondent is encouraged to submit written questions concerning this RFCSP through online at least five (5) calendar days in advance of the Pre-Submittal Conference, in order to expedite the proceedings. City's responses to questions received by this due date may be distributed at the PreSubmittal Conference, as well as being posted on online. Calendar Days: Respondent understands and agrees that this is a 305-calendar day contract. ** pre bid info : Attendance at the Pre-Submittal Conference is optional, but highly encouraged. Respondents who join the WebEx Pre-Submittal Conference are required to sign into the meeting using a QR code provided only during the meeting. This will confirm Respondent's attendance and participation for the PreSubmittal meeting through WebEx. Construction Cost Estimate for Staircase: $320,836.00. Construction Cost Estimate for Sidewalk: $2,869,009.00. SBE (23%)
Post-Bid
Sidewalks / Parking Lot
$3,189,845.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 3, 2026
April 6, 2026
Multiple Locations, San Antonio, TX
Related To This Project
San Antonio, TX
Bid Date: Jan 09 2026
San Antonio, TX
Bid Date: Jan 06 2026
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Jan 27 2026
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Jan 13 2026
San Antonio, TX
Bid Date: Jan 07 2026
San Antonio, TX
Bid Date: Feb 04 2026
San Antonio, TX
Bid Date: Feb 04 2026
San Antonio, TX
Bid Date: Feb 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
