BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 10, 2025 at 7:00 PM

Updated December 11, 2025

Site work for a water / sewer project in Suamico, Wisconsin. Completed plans call for site work for a water / sewer project.

Site Directions: 1st stormwater pond between 3437 & 3403 Wynding Ridge Way. Second and third ponds located at Bay Harbor Elementary School with access off Harbor Lights Rd Project includes dredging, regrading, and placement of riprap on stormwater ponds. 1285 C.Y.- Pond Dredging & Disposal of Material 1905 TON - 12" Riprap Placement w/ Fabric 5 TON - 3/4" Crushed Stone Placement Misc. Erosion Control, Landscaping & Restoration Work involves the construction of traffic control, site stabilization for equipment, protection of existing utilities, erosion control, pond dredging, placing of 12" riprap, placing of 3/4" crushed stone, topsoiling, restoration, disposal of dredged sediment,removal of existing wooded vegetation. (Include additional items as appropriate). Work on Wynding Ridge Way Pond is ANTICIPATED to start on January 20th, 2026 and finish by September 4th , 2026. Work on Bay Harbor Elementary Ponds is ANTICIPATED to start on June 8th, 2026 and finish by September 4th , 2026. The project is scheduled to be completed by September 4th, 2026 Question Deadline 01/02/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. PART A - Wynding Ridge Way Pond Dredging 1A Mobilization LS 1 2A Traffic Control LS 1 3A Tracking Pad EA 1 4A Inlet Protection EA 2 5A Dewatering LS 1 6A Dredging & Disposal of Material* CY 530 7A Geo Fabric Under Riprap (approx. 745 SY) LS 1 8A 6"-12" Riprap TON 520 9A Lanscaping/Restoration-Topsoil, Seed, Fertilizer & Emat PART B - Bay Harbor West Pond 1B Mobilization LS 1 2B Traffic Control LS 1 3B Inlet Protection EA 2 4B Dewatering LS 1 5B Dredging & Disposal of Material* CY 405 6B 3/4" Crushed Stone TON 5 7B Geo Fabric Under Riprap (approx. 1220 SY) LS 1 8B 6"-12" Riprap TON 760 9B Lanscaping/Restoration-Topsoil, Seed, Fertilizer & Emat PART C - Bay Harbor East Pond 1C Mobilization LS 1 2C Traffic Control EA 1 3C Inlet Protection EA 2 4C Dewatering LS 1 5C Dredging & Disposal of Material* CY 350 6C Geo Fabric Under Riprap (approx. 1050 SY) LS 1 7C 6"-12" Riprap TON 625 8C Lanscaping/Restoration-Topsoil, Seed, Fertilizer & Emat

GC Bidding

Water / Sewer

$240,530.00

Public - City

Site Work

13

10

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
17
Bidding Soon
409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

January 20, 2026

Project location map

Multiple Locations, Suamico, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.