BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 30, 2025 at 7:00 PM

Updated December 31, 2025

Demolition and site work for a civil project in La Verkin, Utah. Conceptual plans call for the demolition of a water / sewer project; for site work for a development; and water / sewer project.

Washington County Water Conservancy District (district) is a water conservancy district organized and existing under the Utah Water Conservancy District Act. The district is seeking statements of qualifications from qualified Design Professionals to provide Professional Design Services (procurement item) for the Advanced Water Purification (AWP) Demonstration Facility and Conservation Garden Project as part of the Regional Reuse Purification System (System) (procurement item). Questions regarding downloading the Request for Statement of Qualifications may be directed to Dinah Neumann at dinah@wcwcd.gov or 435-673-3617 no later than January 16th, 2026. The project includes the design and construction management of an Demonstration Facility that will house an Advanced Water Purification system, purifying Type I Reuse water to drinking water standards for the purposes of piloting, permitting, and public outreach. The Conservation Garden will include water-wise landscape features along with interpretive signage. The total footprint of the Demonstration Facility and Conservation Garden will be approximately 3.75 acres. The anticipated footprint of the Demonstration Facility is approximately 2400 square feet. The project also includes the acquisition of a Public Outreach Trailer that will contain demonstrative equipment typical of the AWP process that can be used for presentations at schools and events. It is anticipated that the project design team will be led by an architect and focused on the development of the building and garden. The architect will also work closely with the districts Owner Advisor (Stantec), who will provide the design, sizing, utility needs, and state permitting support needed for the AWP equipment. The project will be delivered using the Construction Manager/General Contractor (CM/GC) approach, allowing for greater collaboration on scope, equipment, schedule, budget, and risk between the selected CM/GC team.

Conceptual

Water / Sewer

$580,000.00

Public - County

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
7
Bidding Soon
151
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

Project location map

To Be Determined, La Verkin, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.