Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 22, 2026 at 7:00 PM
Updated January 23, 2026
Renovation of a municipal facility in Draper, Utah. Completed plans call for the renovation of a municipal facility.
Questions Due Date: Jan 5th 2026, 3:00 PM MST Online Portal Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project. The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project: Project Description: This shall include: The removal and replacement of 8 packaged rooftop units. Gas, Electrical, and Controls connections shall be replaced and units shall be selected to minimize roofing work and eliminate curb adapters. Work shall also include the removal and replacement of two high capacity direct exchange VAV air handling units. These shall be provided with new gas connections, electrical service, controls, and also minimize roofing work. All units shall be provided with factory start up and test and balance. Substantial Completion Date: June 30, 2026 Liquidated Damages: $600.00 per day A bid bond properly signed by the Contractor and a qualified surety and submitted on the AIA Document A310 - 2010 Bid Bond form in the amount of 5% of the bid, must accompany the bid submitted within online The Division of Facilities Construction and Management reserves the right to reject any or all proposals or bids or to waive any formality or technicality in any proposal or bid in the best interest of the State. The Contractor is required to provide performance and payment bonds on the AIA Document A312 - 2010 Performance and Payment Bond Forms (or equivalent) in the amount of 100% of the Contract Sum and secured from a company that meets the requirements specified in UAR 23-1-1102. The Contractor shall comply with and require all subcontractors to comply with the license laws as required by the State of Utah. A. Includes - 1. Furnish all labor, materials, and equipment necessary for the completion of the mechanical and plumbing scope of work. 2. Furnish and install all motors specified in this Division and be responsible for the proper operation of electrical powered equipment furnished by this Division. 3. Furnish exact location of electrical connections and information on motor controls to Division 26. 4. Mechanical Contractor shall obtain the services of independent Test and Balance Agency. 5. Placing the air conditioning, heating, ventilating, and exhaust systems into full operation and continuing their operation during each working day of testing and balancing. 6. Making changes in pulleys, belts, and dampers, or adding dampers, as required for the correct balance as recommended by Balancing Contractor at no additional cost to Owner. 7. Air balance, final adjustment and test run. 8. The satisfactory performance of the completed systems is a requirement of this specification. B. Related Work Specified Elsewhere 1. Conduit, line voltage wiring, outlets, and disconnect switches specified in Division 26. 2. Magnetic starters and thermal protective devices (heaters) not a factory mounted integral part of packaged equipment are specified in Division 26.
Award
Municipal
$347,589.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 15, 2026
February 16, 2026
To Be Determined, Draper, UT
Related To This Project
Draper, UT
Bid Date: Dec 19 2025
Draper, UT
Bid Date: Jan 29 2026
Draper, UT
Bid Date: Jan 14 2026
Draper, UT
Bid Date: Feb 24 2026
Draper, UT
Bid Date: Mar 05 2026
Draper, UT
Bid Date: Mar 20 2026
Draper, UT
Bid Date: Dec 09 2025
Draper, UT
--
Draper, UT
Bid Date: Nov 20 2025
Draper, UT
Bid Date: Nov 10 2025
Draper, UT
Bid Date: Oct 23 2025
Draper, UT
Bid Date: Nov 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
