BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 15, 2026

Demolition and site work for a service station / car wash facility in Birmingham, Alabama. Completed plans call for the demolition of a service station / car wash facility; and for site work for a service station / car wash facility.

Response Format Electronic Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 04/28/2026 3:00 PM (CDT) Project Identification: CNG Station Phase I Demolition Project is comprised of demolition and sitework in the area, as designated in the demolition drawings. Work includes removal of the existing building, existing retaining wall, retaining wall foundations unless otherwise noted. Site grading to provide positive drainage of the site. This site is enclosed by construction fencing with gates installed by the Owner to allow access to the site and securing the site. No Work occurs outside the fenced area. Site work shall be in accord with requirements and approval of the authorities having jurisdiction and the Owner. The same shall be confirmed with written documentation to the Architect and the Owner's Representative. The Project consists of Building interior and exterior, screen walls, and stairs. The project includes complete removal of 154,731 sq ft of all above-grade and below-grade structures and appurtenances, except for the existing building pad, which shall remain intact. Project Location: 973 Forestdale Blvd, Birmingham, AL 35214.

Bid Results

Service Station / Car Wash

$444,500.00

Public - County

Demolition, Site Work

8

15

4

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

June 8, 2026

Project location map

973 Forestdale Blvd, Birmingham, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.