BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work and new construction of a water / sewer project in Chicago, Illinois. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

$18,580,000 and $22,490,000 Group A Furnish and install new electrical chillers, cooling towers, exhaust fans, exhaust ductwork, associated piping, electrical wiring, and any related appurtenances. Remove existing absorption chiller and two cooling towers. Remove and replace, pumps, electrical equipment, mechanical piping, electrical conduits, pneumatic controls, grilles, registers, diffusers, etc., and all associated hangers and supports at the Egan WRP. I-2 Modify existing building control system at Egan WRP. Remove and replace existing combustion control systems and burner management systems at four (4) existing boilers at the Egan WRP. Group B Remove and replace, electrical chiller, pumps, mechanical piping, electrical conduits, pneumatic controls, etc., and all associated hangers and supports at the Kirie WRP. Remove and replace existing combustion control systems and burner management systems at three (3) existing boilers at the Kirie WRP. For Group A: The associated goals are 20% Minority-owned Business Enterprises (MBE), 9% Women-owned Business Enterprises (WBE), 3% Veteran Business Enterprises (VBE). Affirmative Action goals are applicable only to bid items A1 and A4. The MBE, WBE and VBE Utilization goals do not apply to any portion of work identified in the contract as Allowance Items, Contingency Items and Unit Price Items. For Group B: The associated goals are 20% Minority-owned Business Enterprises (MBE), 9% Women-owned Business Enterprises (WBE), 3% Veteran Business Enterprises (VBE). Affirmative Action goals are applicable only to bid items B1 and B3. The MBE, WBE and VBE Utilization goals do not apply to any portion of work identified in the contract as Allowance Items, Contingency Items and Unit Price Items. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

Water / Sewer

$22,490,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
477
Active Projects
230
Bidding Soon
3,262
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2026

March 30, 2026

Project location map

Multiple Locations, Chicago, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.