Renovation of a fire / police facility in Hawthorne, New York. Completed plans call for the renovation of a fire / police facility.

Replace Uninterruptible Power Supply Public Safety Headquarters, Hawthorne, N.Y The work under this Division shall include furnishing and installing all labor, materials, and equipment necessary to complete the installations and interconnections of Electrical Systems as specified herein and as shown on the contract drawings to Replace Uninterruptible Power Supply ("UPS") System located in the basement electrical room of the Public Safety Headquarters, Hawthorne, New York. (Bid range $ 280,000.00 to $ 320,000.00). *The value for this project is based on a financial range of $280,000 to $320,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work under this Contract includes all necessary labor, materials and equipment required for the Replace Uninterruptible Power Supply ("UPS") System, Public Safety Headquarters, Hawthorne, New York: 1. Removal of existing UPS system and all components. 2. The removal of existing pull boxes and installing wires in conduit. 3. The sealing of existing UPS room floor as specified in contract. 4. Installation of new UPS system with batteries installed by manufacturer and all costs, all UPS components, including raceways, conductors, boxes, and all basic materials and labor. 5. The contractor shall pay all costs and fees for the manufacturer commissioning, testing, training, and installation of the new UPS system, battery monitoring system, and 3-year maintenance service contract. Contractor shall pay all costs to have the manufacturer program the UPS to report the real-time UPS status to the County Police IT group via the county network. 6. The removal of power panel feeders from UPS and reinstall on new power panel with circuit breakers furnished and installed by contractor. 7. Provide temporary power for power panels disconnected from existing UPS and the removal of power panel removed from normal power. Extend existing feeder from normal power panel to new UPS power panel. 8. Contractor shall furnish and install UPS-1 panel with circuit breakers as shown on the panel schedule. 9. Contractor shall furnish and install a 6-pair CAT6 data line with a RJ-45 jack between the UPS and County IT data closet.

Post-Bid

Fire / Police

$320,000.00

Public - County

Renovation

10

10

2

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
23
Bidding Soon
4,287
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2026

February 27, 2026

Project location map

1 Saw Mill Riv Pkwy, Hawthorne, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.