Published March 4, 2026 at 7:00 PM

Updated March 5, 2026

Site work for a sidewalk / parking lot in Milford, Massachusetts. Completed plans call for site work for a one-story above grade sidewalk / parking lot.

The project is for the installation of storm water utilities at a solar canopy parking lot. Bidders must submit sealed proposals on forms provided, labeled with the name and address of the bidder, project number, and title. The project duration is scheduled for 90 calendar days to substantial completion. Bidders are required to pay minimum wage rates as determined by the Commissioner of the Division of Occupational Safety. Each bid and filed sub-bid must be secured by a deposit of 5% of the total bid amount in the form of a bid bond, certified, treasurer's, or cashier's check issued by a responsible bank or trust company payable to the Commonwealth of Massachusetts. Electronic bidding documents, plans, and specifications are available upon request and must not be distributed outside of the bidder's company. A mandatory pre-bid site visit is scheduled at the project location. Bid intent forms must be submitted by the date specified. A. Work Included: Provide temporary facilities and controls, including but not limited to the following: 1. Hoisting Equipment and Machinery. 2. Staging. 3. Maintenance of Access. 4. Dust Control. 5. Noise Control. 6. Enclosures. 7. Sanitary Facilities. 8. Construction Barriers. 9. Parking. 10. Safety Protection. 11. Vehicle and Equipment Protection. 12. Fire Safety During Construction. 13. Shoring. 14. Construction Fence. 15. Project Identification Sign. B. Related Work: The following items are not included in this Section and are specified under the designated Sections: 1. Section 334000 - Storm Drain Utilities: A. This Section specifies requirements for implementation of the Stormwater Pollution Prevention Plan (SWPPP), which shall be provided by the Contractor prior to construction. B. The stormwater pollution prevention measures contained in the SWPPP are the minimum required by US Environmental Protection Agency (EPA). The Contractor shall provide additional measures to prevent pollution from stormwater discharges in compliance with the NPDES and all other local, state and federal requirements. The Contractor shall be responsible for complying with the provisions of the SWPPP. C. The Contractor shall NOT begin construction without submitting evidence that a "National Pollution Discharge Elimination System" (NPDES) Notice of Intent governing the discharge of stormwater from the construction site for the entire construction period has been filed at least two weeks prior to construction. D. The Contractor shall conduct the stormwater management practices in accordance with local regulations and governing authorities, the Federal NPDES permit requirements and for any enforcement action taken or imposed by Federal or State agencies. The cost of any fines, construction delays and remedial actions resulting from the Contractor's failure to comply with all provisions of local regulations and Federal NPDES permit requirements shall be paid for by the Contractor at no additional cost to the Owner. E. As a requirement of the EPA's NPDES permitting program, the Owner, each Contractor and Subcontractor shall execute a Contractor's Certification form, a copy of which is included in the SWPPP. F. Dust control shall be the responsibility of the Contractor and dust control operations shall meet the requirements of the Commonwealth of Massachusetts Department of Environmental Protection 310 CMR 7.09: Air Pollution Control Regulations. G. Water shall be used to control dust. A. Provide labor, materials, and equipment necessary to construct the exterior water system complete, including connections to existing pipelines and testing, all as indicated on the Drawings and as specified, including but not limited to the following: 1. Installation of ductile iron pipe, fittings, accessories, and appurtenant work, at the locations and to the lines and grades indicated on the Contract Drawings. 2. The installation of hydrants, gate valves and boxes and concrete thrust blocks. B. Unless otherwise indicated on the Drawings, exterior water lines shall be installed from a point 10 feet outside the building foundation walls to the potable water source C. Related Work: The following items are not included in this Section and will be performed under the designated Sections. 1. Section 310000 -- EARTH WORK for soil materials, excavating, backfilling, and site grading and removal of site utilities.

Bid Results

Sidewalks / Parking Lot

$600,000.00

Public - State/Provincial

Site Work

15

9

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,001
Active Projects
623
Bidding Soon
5,531
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2026

February 20, 2026

Project location map

50 Maple Street Suite 3, Milford, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.