Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 22, 2026 at 8:00 PM
Updated May 23, 2026
Renovation of a playground / park / athletic field in Springfield, Illinois. Completed plans call for the renovation of a 4,697-square-foot playground / park / athletic field.
Children's Safety Village Roof Replacement (Re-bid) - RFP #fd27-07 All Contracts for the Construction of Public Works Are Subject to the Illinois Prevailing Wage Act. Certified Female and Minority Business Enterprises Are Encouraged to Submit Proposals for This Project. SCOPE The City of Springfield desires to contract for roof replacement for all three buildings at the Children's Safety Village, located at 4521 S 11th St in Springfield, Illinois. This work shall include the following: o Remove existing roofing to deck o Replace decking as needed (shall be approved by Owner prior to replacement) o Install synthetic underlayment (Roofrunner or approved equal) o Install Swiftstart (or equal) starter shingles along compete perimeter of roof o Install CertainTeed Landmark Pro Streakfighter algae-resistant shingles (or equal) (color to match existing) o 50-year Surestart protection (or equal) o 130 mph wind warranty o Install proper roof ventilation o Install CertainTeed (or approved equal) ice guard around perimeter of roof, in all valleys, and at all penetrations o Install new drip edge, plumbing boots, flashing where needed o Install new gutters and downspouts o Roof area is approximately 4700 square feet (contractor to verify) o Barn ~ 800 sq ft o Church ~ 2432 sq ft o House ~ 1465 sq ft o Any sheathing replacement must be approved by owner prior to installation. The Contractor is responsible to remove all waste materials, debris and rubbish on a daily basis utilizing trucks, trailers or dumpsters. If a dumpster is required or utilized, provide covered and lockable containers (dumpster) for deposit of waste materials, debris and rubbish from site, and dispose of offsite. Prices to include all labor and materials, as well as all cleanup and disposal.
Post-Bid
Playgrounds / Parks / Athletic Fields
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2026
June 22, 2026
4521 11th St, Springfield, IL
Related To This Project
Springfield, IL
Bid Date: Dec 29 2025
Springfield, IL
Bid Date: Dec 11 2025
Springfield, IL
Bid Date: Dec 18 2025
Springfield, IL
Bid Date: Dec 11 2025
Springfield, IL
Bid Date: Jan 12 2026
Springfield, IL
Bid Date: Jan 16 2026
Springfield, IL
Bid Date: Jan 16 2026
Springfield, IL
Bid Date: Jan 16 2026
Springfield, IL
Bid Date: Dec 18 2025
Springfield, IL
Bid Date: Dec 16 2025
Springfield, IL
Bid Date: Dec 11 2025
Springfield, IL
Bid Date: Nov 25 2025
Springfield, IL
Bid Date: Dec 16 2025
Springfield, IL
Bid Date: Dec 16 2025
Springfield, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
