BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 10, 2025 at 7:00 PM

Updated December 11, 2025

Renovation of a clubhouse / community center in Barnstable, Massachusetts. Completed plans call for the renovation of a clubhouse / community center.

The scope of work includes all labor, materials, equipment, and services required for the construction of the HYCC MAU1 & DH1. Question Deadline 12/29/2025 at 12:00 PM ET The last day to submit questions is 12/29/25, no later than 12:00 noon. Questions shall be submitted in writing through the Public Question and Answer section of the online portal. OSHA Certification is required. 10.4% Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) participation goal required. General bidders must be certified by the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the category of General Building Construction. General bids shall be accompanied by a DCAMM certificate of Eligibility for the category, and an Update Statement. The Town of Barnstable reserves the right to waive any formalities that appear to be in the best interest of the Town. The scope of work includes, but is not limited all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1.Construction of the renovation including, but not limited to: a. Steel framing. b. Concrete work. c. Carpentry and caulking. d. Roofing. e. Mechanical and electrical. f. Sitework Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) policies of the Town of Barnstable are applicable. The "Fair Share" construction goal for this project is a minimum of 10.4% combined MBE/WBE participation by state certified MBEs and WBEs. The Town of Barnstable's Representative for this project and Owner's Project Manager will be: Mark Marinaccio, AIA, Town Architect for the Town of Barnstable. Once the project contract is signed, all project questions, shop drawings, samples and requirements for approvals shall be directed to: Town of Barnstable Attn: Mark Marinaccio, AIA, Town Architect Department of Public Works Administration and Technical Support 800 Pitchers Way Hyannis, MA 02601 Phone: (508) 790-6323 Fax: (508) 790-6344 Email: mark.marinaccio@town.barnstable.ma.us The renovated mechanical systems shall be constructed so as to meet all requirements of the Contract Documents, including, but not limited to, the plans and specifications for the Hyannis Youth and Community Center, 141 Bassett Lane, Hyannis, MA 02601.

GC Bidding

Clubhouse / Community Centers

$1,600,000.00

Public - City

Renovation

23

17

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
161
Bidding Soon
2,888
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

March 23, 2026

Project location map

141 Bassett Ln, Barnstable, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.