Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Site work and paving for a bridge / tunnel in Greenville, South Carolina. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Furnish all required labor, equipment, and materials and perform all operations necessary for installing anchors and dowels in concrete using an adhesive bonding system in accordance with the details shown on the Plans and with the requirements of this Specification. Provide a material system specifically intended for use in structural applications for bonding anchors and dowels to hardened concrete. Limit applications to anchors and dowels installed in vertical, downwardly inclined, and horizontal positions with sustained tensile loading. Do not use adhesive anchors in overhead,upwardly inclined installations, or horizontal positions with sustained tensile loading, unless permission has been obtained from the BCE. Interpretation of the Proposal or Plans shall make a written request for such information to Program Manager no later than 14 calendar days prior to the letting date for the contract. Removal of Existing Structure, Grading, Concrete for Structures, Reinforcing Steel, Cored Slabs, Concrete Barrier Parapet, Micropiles, Guardrail, Hot Mix Asphalt, Ornamental Steel Picket Fence, and other Miscellaneous Items. Construction Cost Range: $600k - $1m *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$970,782.00

Public - County

Paving, Site Work

20

11

9

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
136
Bidding Soon
1,337
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

February 9, 2026

Project location map

Willard St, Greenville, SC


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed