Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 5, 2026 at 7:00 PM
Updated January 9, 2026
Site work and paving for a bridge / tunnel in Greenville, South Carolina. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Furnish all required labor, equipment, and materials and perform all operations necessary for installing anchors and dowels in concrete using an adhesive bonding system in accordance with the details shown on the Plans and with the requirements of this Specification. Provide a material system specifically intended for use in structural applications for bonding anchors and dowels to hardened concrete. Limit applications to anchors and dowels installed in vertical, downwardly inclined, and horizontal positions with sustained tensile loading. Do not use adhesive anchors in overhead,upwardly inclined installations, or horizontal positions with sustained tensile loading, unless permission has been obtained from the BCE. Interpretation of the Proposal or Plans shall make a written request for such information to Program Manager no later than 14 calendar days prior to the letting date for the contract. Removal of Existing Structure, Grading, Concrete for Structures, Reinforcing Steel, Cored Slabs, Concrete Barrier Parapet, Micropiles, Guardrail, Hot Mix Asphalt, Ornamental Steel Picket Fence, and other Miscellaneous Items. Construction Cost Range: $600k - $1m *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Bridges / Tunnels
$1,000,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 8, 2026
February 9, 2026
Willard St, Greenville, SC
Related To This Project
Greenville, SC
Bid Date: Jan 16 2026
Greenville, SC
Bid Date: Jan 27 2026
Greenville, SC
Bid Date: Jan 06 2026
Greenville, SC
Bid Date: Jan 30 2026
Greenville, SC
Bid Date: Jan 22 2026
Greenville, SC
Bid Date: Jan 23 2026
Greenville, SC
--
Greenville, SC
--
Greenville, SC
Bid Date: Jan 15 2026
Greenville, SC
Bid Date: Jan 06 2026
Greenville, SC
Bid Date: Jan 15 2026
Greenville, SC
--
Greenville, SC
--
Greenville, SC
Bid Date: Jan 07 2026
Greenville, SC
Bid Date: Dec 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
