Renovation of a mixed-use development in Lemay, Missouri. Working plans call for the renovation of a medical facility.
This project involves construction services to replace and upgrade steam safety valves within the steam boiler system in Building 75 at the Jefferson Barracks VA. The scope includes removal and installation of eight steam safety valves: two per each of the three boilers (six total), one safety valve following the PRV station upstream of the deaerator, and one deaerator safety valve. All work and equipment must comply with VHA Directive 1810. For the boilers, two new valves per unit will be installed with specific requirements: one set to relieve steam at 130 psi for 80% of total steam capacity (28,000 lbs/hr) and another at 135 psi for 100% capacity (35,000 lbs/hr), both constructed of cast steel. Installation will require flange reducers, upsized drip bowls/cups, upgraded A193 flange steam bolts, and modifications to steam escape piping as needed. The PRV safety valve will be replaced with a new Kunkle valve rated to relieve steam at 15 psi with a capacity of 17,972 lbs/hr, and the deaerator safety valve will be replaced with a new valve rated at 15 psi with a capacity of 2,990 lbs/hr (acceptable range 500-1,000 lbs/hr), also constructed of cast steel. The contractor shall provide all labor, supervision, materials, tools, equipment, scaffolding, and resources necessary to complete the work, including removal and disposal of old equipment. Responsibilities include safe shutdown and lockout/tagout of boilers and steam lines, scaffolding setup and removal, leak testing after installation, and safe restart of the steam system. All work must meet final construction specifications and comply with records management and privacy requirements. The period of performance is 180 calendar days after notice to proceed. Location: Jefferson Barracks VA, Building 75, 1 Jefferson Barracks Drive, St. Louis, MO 63125. The project construction cost range is between $150,000 and $500,000. The duration of the project is estimated to be 180 calendar days after receipt of notice to proceed. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$500,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2026
1 Jefferson Barracks Dr, Lemay, MO
Related To This Project
Lemay, MO
Bid Date: Dec 12 2025
Lemay, MO
Bid Date: Oct 30 2025
Lemay, MO
--
Lemay, MO
Bid Date: May 16 2025
Lemay, MO
Bid Date: Oct 25 2023
Lemay, MO
Bid Date: Oct 18 2018
Lemay, MO
Bid Date: Jul 13 2022
Lemay, MO
Bid Date: Apr 08 2021
Lemay, MO
Bid Date: Aug 17 2021
Buckley Road Bridges No. 528 and 528-P and Hallmark Southshire CRS Pavement Rehabilitation - 4882278
Lemay, MO
Bid Date: May 17 2023
Concordia, MO
Bid Date: Jan 30 2026
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.