Renovation of a mixed-use development in Lemay, Missouri. Working plans call for the renovation of a medical facility.

This project involves construction services to replace and upgrade steam safety valves within the steam boiler system in Building 75 at the Jefferson Barracks VA. The scope includes removal and installation of eight steam safety valves: two per each of the three boilers (six total), one safety valve following the PRV station upstream of the deaerator, and one deaerator safety valve. All work and equipment must comply with VHA Directive 1810. For the boilers, two new valves per unit will be installed with specific requirements: one set to relieve steam at 130 psi for 80% of total steam capacity (28,000 lbs/hr) and another at 135 psi for 100% capacity (35,000 lbs/hr), both constructed of cast steel. Installation will require flange reducers, upsized drip bowls/cups, upgraded A193 flange steam bolts, and modifications to steam escape piping as needed. The PRV safety valve will be replaced with a new Kunkle valve rated to relieve steam at 15 psi with a capacity of 17,972 lbs/hr, and the deaerator safety valve will be replaced with a new valve rated at 15 psi with a capacity of 2,990 lbs/hr (acceptable range 500-1,000 lbs/hr), also constructed of cast steel. The contractor shall provide all labor, supervision, materials, tools, equipment, scaffolding, and resources necessary to complete the work, including removal and disposal of old equipment. Responsibilities include safe shutdown and lockout/tagout of boilers and steam lines, scaffolding setup and removal, leak testing after installation, and safe restart of the steam system. All work must meet final construction specifications and comply with records management and privacy requirements. The period of performance is 180 calendar days after notice to proceed. Location: Jefferson Barracks VA, Building 75, 1 Jefferson Barracks Drive, St. Louis, MO 63125. The project construction cost range is between $150,000 and $500,000. The duration of the project is estimated to be 180 calendar days after receipt of notice to proceed. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Military

$500,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
137
Bidding Soon
1,226
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.