BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2026 at 7:00 PM

Updated February 18, 2026

Site work and renovation of a water / sewer project in Bowie, Maryland. Completed plans call for the renovation of a one-story above grade water / sewer project.

MBE/SLBE Goal: 23% Perform construction upgrades at the Green Branch WWPS, located at 4200 N.W. Crain Highway, Bowie, in Prince George's County, MD, to include the following: replacement of existing heating and ventilation systems including associated ductwork, louvers, and dampers; replacement of existing two dry pit submersible non-clog wastewater pumps including related valves and appurtenances; replacement of existing flow meter piping and instrumentation with new magnetic meter and associated components; provision of temporary equipment, instruments, tools, and manpower to maintain proper ventilation and sewage pumping capacity; replacement of existing Pump Control Panel with Commission Furnished Equipment including field instruments and alarms; replacement of existing combustible gas monitoring transmitter, sensor, and sample pump assembly; replacement of Instrumentation Panel and all related electrical connections; replacement of HVAC and odor control panel, instruments, and alarms; replacement of Pump Control Panel and HVAC control panel-related electrical connections; replacement of existing Lighting Features; replacement of Pump Bases and other minor structural repairs and modifications; new wall openings and modification of existing openings, veneers, louvers, blank off panels, and metal doors; temporary pump-and-haul operation required to facilitate construction of the new pump station Isolation Valve; and temporary Bypass pumping system required for sewer Pump replacement. Question Deadline 01/05/2026 at 2:00 PM ET All questions pertaining to the Solicitation or Contract Documents shall only be submitted by a Bidder/Offeror to the Procurement Officer identified in the Solicitation via the Online Discussion feature in the Supplier Portal. i. HVAC and Plumbing Improvements: Replacement of existing heating and ventilation systems including associated ductwork, louvers, and dampers for compliance with NFPA 820. ii. Pump Station Improvements: Replacement of existing two dry pit submersible non-clog wastewater pumps including related valves, and appurtenances. Replacement of existing flow meter piping and instrumentation with new magnetic meter, related piping, valves, and appurtenances. iii. Other Mechanical: Provision of temporary equipment, instruments, tools, and manpower to maintain proper ventilation and sewage pumping capacity of the facility. iv. Instrumentation & Process Control System: Replacement of existing Pump Control Panel with Commission Furnished Equipment, including field instruments and alarms. Replacement of existing combustible gas monitoring transmitter, sensor, and sample pump assembly. Replacement of existing Instrumentation Panel, including all related electrical connections. Replacement of existing HVAC and odor control panel, instruments, and alarms. v. Electrical Improvements: Replacement of existing Pump Control Panel and HVAC control panelrelated electrical connections. Replacement of existing Lighting Features.

Bid Results

Water / Sewer

$4,367,150.00

Public - City

Renovation, Site Work

157

33

29

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
4
Bidding Soon
1,928
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.