BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Site work and new construction of a mixed-use development in Spanish Fork, Utah. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

As of December 9, 2025, a contractor has been selected and construction is under way. *Previous solicitation listed below for reference:* Questions: For questions regarding this project, please contact Richard Morley, Director of American Leadership Academy rmorley@americanleadership.net. Questions are due by 4/8/2025 at 10:00 AM The Construction Management/General Contractor (CM/GC) scope of work includes the following projects: Elementary Facility Upgrades Budget: $1 million Jr High Facility Upgrade Budget: $500,000 High School Facility Upgrades Budget: $1 million Painting: Refresh common areas and classrooms to create a vibrant and welcoming atmosphere. Flooring: Update flooring in critical areas to improve aesthetics and functionality. Building Entrances: Update entrances to include secure entry points for security purposes and enhance the entrances to create a welcoming atmosphere for students, staff, and visitors. PreK - Kindergarten/Administration Building Budget: $4.5 Million PreK: 4 rooms (800-900 square feet) Kindergarten: 6 rooms (900 square feet) Lunch/Indoor flex room: 1200-1500 square feet Admin Space: Reception area, conference room, finance office, marketing and curriculum, Title-SPED, instructional coaches, assistant directors and directors offices. 10 office spaces. New Athletic Center Budget: $9 million Gyms: Design two new gyms to accommodate various sports and physical education activities. Weight Room: Develop a state-of-the-art weight room for student-athletes and physical education classes. Indoor Practice Area: Create an indoor practice area for football, soccer, and track and field, prioritizing a field that is as close to half a football field as possible. (60 yards X 50 yards) Medical Training Area: Design a modern medical training area to support athletic programs. Team Gathering Room: Provide a team gathering room, along with locker rooms and coaches' offices, ensuring high-quality boys and girls locker rooms that can double as home and visitor locker rooms. Second Floor: Plan for a possible second floor over the weight room and locker rooms. Batting Cages: Identify a place for two batting cages, with a lower priority compared to other elements. Bunker and Bleacher Upgrades Budget: $500,000 Upgrades: Update the bunker and bleachers to enhance the overall athletic experience for students, staff, and spectators. Question Deadline 04/08/2025 at 10:00 AM MT Q&A For ALA RFP for Athletic/Pre K Admin Buildings: 4/5/25

Under Construction

Educational

$13,900,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

116 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
56
Bidding Soon
874
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

Project location map

898 W 1100 S, Spanish Fork, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.