BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 8, 2026

Site work for a water / sewer project in North Bend, Washington. Completed plans call for site work for a one-story above grade water / sewer project.

**As of January 02, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** The project consists of two schedules of work. Schedule A consists of installing approximately 900 linear feet of 8-inch and 12-inch ductile iron water main to replace existing asbestos cement and PVC water main on SE North Bend Way as shown on the Plans and as described in the Specifications. Schedule A also includes abandoning water main and filling with CDF, installing water services and hydrants, hot mix asphalt trench restoration, concrete road restoration, and general restoration. Schedule B consists of installing approximately 1,200 linear feet of 8-inch ductile iron water main to replace existing asbestos cement water main on SE Mount Si Road and SE 128th Place as shown on the Plans and as described in the Specifications. Schedule B also includes installing water services and hydrants, hot mix asphalt trench restoration, and general restoration. The Work shall be substantially complete within 40 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the Sallal Water Association, North Bend, Washington. The project consists of two schedules of work. Schedule A consists of installing approximately 900 linear feet of 8-inch and 12-inch ductile iron water main to replace existing asbestos cement and PVC water main on SE North Bend Way as shown on the Plans and as described in the Specifications. Schedule A also includes abandoning water main and filling with CDF, installing water services and hydrants, hot mix asphalt trench restoration, concrete road restoration, and general restoration. Schedule B consists of installing approximately 1,200 linear feet of 8-inch ductile iron water main to replace existing asbestos cement water main on SE Mount Si Road and SE 128th Place as shown on the Plans and as described in the Specifications. Schedule B also includes installing water services and hydrants, hot mix asphalt trench restoration, and general restoration. Contract questions shall be directed only to the office of the Project Engineer.

Bid Results

Water / Sewer

$828,549.00

Public - City

Site Work

21

12

4

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
101
Bidding Soon
1,310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 23, 2025

February 23, 2026

Project location map

SE 128th Pl & SE Mount Si Rd, North Bend, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.